Browse
Search
S Solid Waste - ECOFLO for Household Hazardous Waste
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Solid Waste - ECOFLO for Household Hazardous Waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 12:18:14 PM
Creation date
6/2/2009 12:12:18 PM
Metadata
Fields
Template:
BOCC
Date
6/12/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4e
Document Relationships
Agenda - 06-12-2007-4e
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 06-12-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
boxes, newspaper, bags and other materials used only to transport smaller containers of • <br />hazardous waste will not be weighed unless they are contaminated to the extent that they require <br />treatment as hazardous waste. Contractor will bill County monthly for disposal, supplies, and <br />transportation, and shall provide required manifests and reports, as listed in Section 4, subsection <br />k and subsection 1. <br />Scone of Services: <br />Section4.b) of the..Agreemexlt~is amended as follows: <br />Operational Hours and Holiday Schedule: HHW and CESQG Wastes will be accepted at Orange <br />County's Collection Facility six'(6) days per week, each week. The program shall be open to <br />accept acceptable wastes from eligible participants during the following hours: Monday through <br />Friday, loam until 6pm, and Saturday 7:30am until 12 noon. County reserves the right to <br />modify program hours as needed, and shall do so only after receiving the approval of Contractor. <br />The holidays observed by the HHW Program shall coincide with the holidays observed by the <br />Orange County Landfill. In general, the only holidays observed by the Orange County Landfill <br />are Independence Day (4th of July), Labor Day, Thanksgiving Day, Christmas Day, New Years <br />Day {January 1), and Memorial Day. The HHW Program. will not operate on days when the <br />Orange County Landfill is closed due to a holiday or to special events such ~as emergencies, <br />adverse weather conditions, or other reasons deemed appropriate by the .Orange County <br />Department of Solid Waste Management, the Orange County Manager, or the Orange County <br />Board of County Commissioners. Exceptions to the regular operational hours beyond those • <br />listed above shall be made only with prior written approval of County. <br />Section 4.f) of the Agreement is amended as follows: <br />Commercial Waste and Conditionally Exempt Small Quantity Generator Program. County and <br />Contractor shall jointly establish and operate a program to accept and manage Hazardous Waste <br />produced by Conditionally Exempt Small Quantity Generators (CESQG) located within Orange <br />County. By operating this program jointly with Contractor, County does not take possession of <br />or become the legal generator of any commercially generated hazardous waste accepted by the <br />CESQG Waste Program. <br />The County, Site Attendant, and Contractor will work to prevent commercially generated <br />hazardous waste from being falsely presented as household hazardous waste to the. Household <br />Hazardous Waste Program, and will also work to prevent commercially generated waste that <br />originates from outside of Orange County to be delivered to the program. <br />The CESQG Program will operate during the same hours as the HHW collection, though the <br />County will actively seek to schedule large loads of CESQG Waste to be delivered during those <br />times and days when the HHW program experiences less participation, with the objective of both <br />minimizing the need for households participants to wait while CESQG waste is being unloaded, <br />and also to allow Contractor enough notice to provide extra staff if necessary to receive and <br />manage large loads of CESQG waste. • <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.