Orange County NC Website
ORANGE COUNTY JAIL <br />HVAC SYSTEM UPGRADE <br />LIFE CYCLE COST ANALYSIS <br />~NTRC]D~JCTI~N <br />In an ahem. t to ident%fy the best replacement system for the Orange bounty fail H~'AC system <br />.p <br />. ho~en far fur~he~. stud ~n this Life ~ cl.e host Anal sus. This Est <br />the. fol~dw~ng systems were c ~ ~ ~ Y y <br />does NAT indicate any order of preference: <br />~ Four-pipe hydro~uc systems using constant volume 4-pipe air handling units. This <br />scheme would involve running new hat water piping and chilled water piping where <br />necessary, new chillers and boilers, and new air handli~ag units. <br />~ dater source heat pump units distributed in closets and on mechanical platforms. This <br />system would involve adding a cooling tower and heat exchanger, replacing existing <br />bailers, runtung new piping throughout the building, ~ and installing new water source heat <br />. pumps in the building. <br />® ~~ air handling units with hot water heat. This system would require replacing air <br />haridli~ ~ units, re lacing boilers and hat water piping, and adding ~~ condensing units <br />g p <br />on the roof. <br />~~ Oeathermal heat pumps. Though it may have bean attractive, this option 'was eliminated <br />due to the a~-~senee of adequate area and tl~e camplication~ ass~a~ciated with installing 1 S- <br />2~~ ~SQ~ dee wells ~ aced out on ~0~ x ~~~ .grid spacing. T'he terrain surrounding the <br />p P . <br />jail is predorninatel~ payed areas ~sixeets~ and. parking}, adjacent buildings, and gaassy <br />areas containing a significant amount of trees. ~. order to maintain a high level of <br />eff ciency, geatliermal well fields should be located as dose la the building as possible tea <br />minimize .the amount of pumping power required. horizon#al trenching anal vertical <br />drillin~~ in.~e immediate area of the jail would slgnifcantly disrupt services to this <br />~ ~ " ~y r <br />building and the surrounding bu~ld~ngs as well. The gassy area surrounding the Old <br />Cvu~~thouse was eluted because the trenching and drilling required could destroy the <br />root system. for the treed .in this area. Alsoa any piping would have to be tunneled below <br />the :street and would have to be coordinated with any utilities in this area ~xnuch are <br />unknown}. <br />~FT~iC~~ O~F ANALYSE <br />Cost estimates far system were performed far each of the s~ste~n,s described above, based on <br />historical cash data and RS beans cast estimating manuals. These estimates are far comparison <br />u ~ ~ ~ uses only at this point as the project budget will need to reflect other design ele~~nentss prices, <br />p~ <br />and. pl~asing~ etc. The building envelope and load characteristics were .modeled using Bquest <br />software ~OC~~-2~. Building use was n~adeled based on 24-hour occupancy and energy output <br />was compared. with actual utility usage obtained from. the owner to verify the accuracy of the <br />~nadel, <br />