Browse
Search
NS Jail HVAC System Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Jail HVAC System Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 10:09:14 AM
Creation date
6/1/2009 4:24:16 PM
Metadata
Fields
Template:
BOCC
Date
6/12/2007
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
4aa
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a5 <br />R~~I~N S~R~IC~~ F~t~FC1~~ <br />Change County Jail . <br />Existing Building Code Review <br />Hillsbamugh, North Carotins <br />May l8, ~a~~ <br />Reese, Noland, ~ McEtrath Engineers pr+~pase to provide ~'rafessianat Engineering Services for <br />perfar-ning are. existing building code review ofthis facility. <br />PRt]JEC~T ,DESCRIPTION: Perfr~rm, a NC~ Building Code Chapter 34 Existing Building~Code review, to <br />idei~ti ~ ` code de~~iencies which will be required to be remedied in ~arder to proceed with the installation ~f <br />fY <br />anew HV~.~ system for the facility. <br />FEE C~u~r lump sum. fee ~vr this study Eight Thousand Uoltars ~$S,t10~.~0}. The milestones for billing are <br />as fnlov~!s: Presentation of Study 90°f~, tomptetian and Acceptance 1~'Ia. <br />BASIC SERVICES: The lump sum fee proposed above includes the fotlawing basic services: <br />1. Iri Gonjunctlan with our Acchitectura~l C~onsult~ant; perform the study to determine detlciencies. <br />~. It~s~evaluated ~n~is study would include campa~hnentation~ required fre separations, H~~C <br />s stcros.re ~uir~ents, autarnatic l~irelsmake detection, smoke control, nneans of ~~ress, egress lighting, <br />y Q <br />eleYator ctintrol, and autamatiic sprinkler requirements. . <br />3. Re~aew our~~~ndings with. the Uwner ineludin~ ire~otumending aptiAns available to cor~cf deticienc~es. <br />4, Review the'study with the ~caunty building inspections department and contin:natian~ of th.e re~ul~d <br />::.. . <br />scope of repairs. . <br />5. P~mvide budget estimates ofconsouction cost for the items identified. <br />ADDITIC~~AL SERVICES: The lump sum fee proposed above does not include serviced such ~ those <br />listed below. we will propose additYdnal fees for such services upon request: <br />1. Design of Garrective items identified iq the study. <br />BILt~lN~SIPAYMENTS: Invoices will be presented mcinthty, based an progress during the month. <br />Paytuents will. be due vn a net 30-day basis. Financing charges on balance beyoad ~~ days will be 1- l 1~% <br />per month ~ 18~/~ A-1'R~. if we shanld have to seek legal action tai effect callectian~ and we wail in <br />litigation, then alt costs assoGxated with collecting overdue accounts will be recoverable. If payments are <br />withheld. or disputed, then we retain the right to suspend further services until the aunt is current. <br />
The URL can be used to link to this page
Your browser does not support the video tag.