Orange County NC Website
ib <br />~~rr~ 1'i~~~,~ <br />EFLAN~ SEWER SYSTEM <br />SCI~E~ULE <br />R.~C's P.xojec schedule should pxov~de pxojec~ partiapans with a com~n.on po~.t of reference fox pxojec~ <br />structure and deadlines. The project schedule provided below assumes ghat dada can be obtained and <br />processed in a tamely fashion. <br />~ Project Initiation <br />~ Develop Rate Model to Project Revenues <br />Expenditures <br />3 Forecast Revenue Requirements <br />4 Rate Calculation <br />5 Finalize Rate Model & Report <br />6 Presentation of Results (Optional) <br />Proposal for Rate Studyfor Small Wastewater Collection Utility <br />Represents trip to Efland <br />Represents key deliverables: the draft report, final report, and delivery of the rate model. <br />ONSULTANTS, NC.10 <br />