Browse
Search
NS Purchasing - Raftelis Financial Consultant - Efland Sewer Rates Study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Purchasing - Raftelis Financial Consultant - Efland Sewer Rates Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 10:08:04 AM
Creation date
6/1/2009 3:43:07 PM
Metadata
Fields
Template:
BOCC
Date
6/12/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4gg
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~ <br />qtr! ~a~'~1~ <br />EFLAND SEDER SYS~"EN~ <br />Proposal for Rate Study for Small Wastewater Collection Utility <br />PROJECT APPROACH AND TIMELINE <br />Project Understanduag <br />Since 1987, C)range County, Noah. Carolina ~"County"} has awned and operated a wastewater collection <br />system for a small, utility serving approximately 240 custonaexs in Efland, Noah Carolina ~"Efland System"~. <br />wastewater collected in the Efland System is conveyed to the Town of 1-~llsborough, North. Carolina <br />~"`own"} fog i~eatment and disposal The Ffland Syste~a consists p~ma~ily of ~esident~ customers; <br />however, service is provided to a select number of commercial and industrial accounts. 'fie Efland System <br />generates average monthly wastewater flows of 1.5 won gallons, including inflow and infiltration. The <br />County is in the regulatory review process of expanding the Eflaaad System to serve 54-75 additional <br />customers. <br />The Eflan.d System's wastewater rates have ,remained unchanged since they were fast established in 1987. All <br />customers pay a minimum charge of X15.74 which includes the fast 3,404 gallops based on water usage. <br />Customers using above 3,444 gallons are then assessed a volumetric rate of X4.54 per 1,440 gallons of water <br />usage. <br />The County has requested proposals from certified consultants to conduct a wastewater Rate and Financial <br />Planning Study ~"Study"} for the Efland System. Recently, the County determined that the cost tv operate <br />the Efland System exceeded the amount of revenues being collected by approximately 14D,044 per year. <br />'T`his revenue shortfall is being subsidized currently by transfers from. the General Fund and the County is <br />interested in evaluating the impact of adjusting rates to provide for aself-sustaining operation. ~ However, a <br />significant portion of the customers that receive service from the Efland System are classified by the County <br />as low-i~n.co~.e. As such, an important aspect of tb.is Study wi~1 be to evaluate the potential impact on <br />customers while considering rate affordability pricing objectives. <br />Scope of work <br />The scope of work described below is based upon our review of the County's Request for Proposal #513D <br />~"RAP"} and our extensive experience in completing wastewater cost of service and rate studies for numerous <br />other utilli.:des. 'I`bis approach has been tailored tv address the specific objectives and cvncem.s identified ~. <br />the RFP, while still maintaining thane elements that we believe axe essential for completing a successful. <br />comprehensive wastewater rate study. The County's RFP listed several objectives which the consultant will. <br />be required to address, at a minimum, as part of the scope of work for the Study. Uur proposed scope of <br />work and work plan, which is provided below, incorporates each of the items requested by the County. <br />TASS .: Project Iniria~ion and Management <br />we believe that the execution of a productive kickoff meeting with the County is the most effective way to <br />begin a project of this nature. The goals fox this meeting include: <br />Providing a forum to finalize the work plan and schedule with the County; <br />Ensuring that we have an understanding of the overall goals of the Study; and <br />Reviewing the data needs for the project <br />ONSULTANTS, jNI C 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.