Orange County NC Website
since HVAC is a primary energy consumer in a building. The installation of the <br />four-pipe systems approved by the Board not only added an expected eight <br />years to the life of the systems, but recouped the capital cost in a very <br />respectable 8.9 years. <br />April 7, 2009: The Board approved an additional $225,788 to install emergency <br />generators for the office building to ensure continued operations of the County's <br />data center during power outages. The office building also contains several <br />conference rooms which could serve emergency response needs if power were <br />available. An emergency generator was not included in the original proposal, but <br />is prudent given the occupancy of the building. <br />Total cost of the expanded County campus is budgeted at $25,700,000, which <br />includes all development and construction costs, as well as costs to upfit and <br />furnish the Gateway Center offices, the office building and the Library. The <br />Gateway Center property was purchased as of February 23, 2009 pursuant to <br />the contract. The office building and library are scheduled for completion in <br />Summer 2009. <br />