Orange County NC Website
June 21, 2007 <br />CONCLUSIONS: <br />Concept A (50 existing lots) PER LOT COST WITH TOWN ASSISTANCE TO EXISTING LOTS: <br />$59,000 to $60,000 + MONTHLY BILL <br />Concept A (50 existing lots + 50 new lots) PER LOT COST WITH TOWN ASSISTANCE TO EXISTING LOTS: <br />$32,000 to $33,300 + MONTHLY BILL <br />Concept A (50 existing lots + 100 new lots) PER LOT COST WITH TOWN ASSISTANCE TO EXISTING LOTS <br />$23,000 to $24,400 + MONTHLY BILL <br />'THESE FIGURES COULD INCREASE OVER TIME WITH RISING CONSTRUCTION COSTS; <br />OWASA ESTIMATES CONSTUCTION COSTS COULD INCREASE 8% PER YEAR <br />