Browse
Search
Agenda - 06-02-2009 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 06-02-2009
>
Agenda - 06-02-2009 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 12:11:42 PM
Creation date
5/29/2009 5:28:26 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes - 20090602
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 21, 2007 <br />SAMPLE FINANCIAL ANALYSIS: Sewer Asessment project with Town Assistance* <br />OWASA SEWER EXTENSION INTO ROGERS ROAD STUDY AREA <br />"To receive Town assitance calculation assumes property is in town limits <br />CONCEPT A: ROGERS ROAD WITHIN TOWN LIMITS (ANNEXATION) <br />COST DISTRIBUTION ON PER -LOT BASIS(excluding proposed Habitat project) <br />EST. COST OF PROJECT FOR CONCEPT A <br />$2,900,000 <br /># OF LOTS <br />50 <br />TOWN ASSISTANCE PER LOT (UPPER LIMIT) <br />$4,500 <br />TOTAL TOWN REIMBURSEMENT (if funds were available) <br />$225,000.00 <br />TOTAL ASSESSMENT COST AFTER ASSISTANCE <br />$2,675,000.00 <br />TOTAL ASSESSMENT FEE PER LOT (AFTER ASSISTANCE) <br />UPFRONT SEWER TAP FEE <br />%_ <br />UPFRONT AVAILABILITY FEE (dependent on sq ft of house) <br />1000 <br />1500 2000 2500 <br />AVAILABILITY FEE (Oct1,2007) <br />44 <br />0.0" #MAO AWN <br />UPFRONT PLUMBING EXTENSION COST PER LINEAR FT <br />$25.00 <br />$25.00 $25.00 $25.00 <br />ESTIMATED COST FOR 100 LINEAR FT <br />u , <br />"A" ,. .vvmd) <br />TOTAL COST TO CONSTRUCT & RECEIVE SERVICE PER LOT <br />$K11111140 <br />111";W04 #% <br />Average Household Gallons Consumed /Month <br />6,000g <br />Monthly Bill <br />$59.00 <br />page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.