Browse
Search
Agenda - 06-02-2009 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 06-02-2009
>
Agenda - 06-02-2009 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 12:11:42 PM
Creation date
5/29/2009 5:28:26 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes - 20090602
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Land Use Master Plan <br />Once the community design workshop was com- <br />pleted, the Durham Area Design Group merged <br />key concepts from the plans of each team <br />into a composite Land Use Master Plan <br />(Figure 9). The Master Plan and associated <br />road network is meant to be conceptual <br />in nature. If this report is adopted as a <br />component of Chapel Hill's Comprehensive <br />Plan, this land use plan would serve as a <br />guide for Chapel Hill and Joint Planning <br />Area Land Use Map amendments. Figure <br />10 is the Task Force's Land Use Plan in a <br />format prepared by Town staff. <br />The Rogers Road Master Plan also <br />suggests potential alignments for new <br />roads recommended by the Task Force. <br />Figure 11 "Conceptual Street Network with <br />Existing Streets" is meant to be concep- <br />tual in nature. It is intended to be viewed <br />as a guide for future development rather <br />than definitive alignments endorsed by the <br />Task Force. The Task Force believes that <br />any new development should adhere to <br />principles of connectivity and utilize a grid <br />street pattern in more densely developed areas. <br />17 <br />Figure 9 - Composite Land Use Plan prepared by the Durham Area <br />Designers <br />
The URL can be used to link to this page
Your browser does not support the video tag.