Browse
Search
Agenda - 06-02-2009 - 4gg
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 06-02-2009
>
Agenda - 06-02-2009 - 4gg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2009 5:07:15 PM
Creation date
5/29/2009 5:07:13 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4gg
Document Relationships
Minutes - 20090602
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County with an application for sewer service to the <br />Efland Sewer System and who have rovided Oran a County <br />with a signed and acknowledged Efland Sewer System Sewer <br />Easement and Agreement but have not been connected to <br />the system because their property affected by the Sewer <br />Easement and Agreement is not yet served by the sewer <br />system are, with respect to the property affected by the <br />Agreement, exempt from Orange County availability fees, <br />provided they connect to the sewer system and become <br />sewer customers of the sewer system with respect to the <br />property covered by the Sewer Easement and Agreement <br />signed by them within 30 days of notification that <br />connection can be made. Availability Fees shall be paid <br />by the user with a completed and signed Efland Sewer <br />System Sewer Easement and Agreement. <br />C. Acreage Fee []. <br />Each person, firm, or corporation connecting to the <br />system (hereafter user or users) shall pay a $1,000.00 <br />per acre capital replacement fee. The original 212 <br />potential Efland Area Sewer System customers who have <br />provided Orange County with an application for sewer <br />service to the Efland Sewer System and who have provided <br />Orange County with a signed and acknowledged Efland <br />Sewer System Sewer Easement and Agreement but have not <br />been connected to the system because their property <br />affected by the Sewer Easement and Agreement is not yet <br />served by the sewer system are, with respect to the <br />property affected by the Agreement, exempt from Orange <br />County acreage fees, provided they connect to the sewer <br />system and become sewer customers of the sewer system <br />with respect to the property covered by the Sewer <br />Easement and Agreement signed by them within 30 days of <br />notification that connection can be made. Acreage Fees <br />shall be paid by the user with a completed and signed <br />Efland Sewer System Sewer Easement and Agreement. <br />D. Stub-out Service Line Fee [~,=e~]. <br />Each person, firm, or corporation connecting to the <br />system (hereafter user or users) shall pay a stub-out <br />service line fee in an amount equal to the <br />administrative and construction cost to Orange County of <br />installing a service line. This fee shall be based on <br />the out-of-pocket cost to Orange County for installing <br />the service line plus an allocated cost equal to the <br />administration cost to Orange County of having the <br />installation accomplished. The original 212 potential <br />Efland Area Sewer System customers who have provided <br />Orange County with an application for sewer service to <br />the Efland Sewer System and who have provided Orange <br />County with a signed and acknowledged Efland Sewer <br />System Sewer Easement and Agreement but have not been <br />connected to the system because their property affected <br />
The URL can be used to link to this page
Your browser does not support the video tag.