Orange County NC Website
R~ ENCINEERINfi, ANC. w ENCNEERINC PR4P4SA~. <br />Page 3 t]ctober 9, 2~~7 <br />Schedule <br />The anticipated time required in preparing the foundationlflooriepair plans is approximately <br />six to eight weeks from the tinge in which we receive formal authorization ~TP~ from you to <br />proceed. <br />Results <br />As stated previously in this proposal, the primary purpose of our involvement will be to <br />determine structurally appropriate foundationlfloorrepairs to address existing structural <br />issues. This proposal has been written as a designlbid project with RB Engineering, Inc, <br />primarily handling the inspectionldesignaspect ofthe project and the building owner <br />primarily handling the bidlconstruction aspect of the project. At the completion of our design <br />work, we will provide you with an engineered set of construction documents, which qualified <br />repair contractors may competitively bid. upon. <br />Thank you again for the opportunity to submit this proposal, Vie look forward to working <br />with you on this assignment. Should you have any questions or concerns regarding this <br />proposal, please feel free to contact me at any time. <br />Respectfully submitted, <br />0 <br />Ron Butler, PE <br />RB Engineering, Tnc. <br />OwnerlPresident <br />