Orange County NC Website
RB ENGINEERING, INC. <br />Page 2 <br />ENGINEERING PRt~PGSAL <br />October 1~, 2447 <br />The primary purpose of our involvement wi11 be to determine structurally appropriate <br />foundationlfloorrepairs to address the existing structural issues and to prepare repair plans <br />and.project specifications. During the construction phase of the project, we will assist on a <br />limited and as~needed basis to ensure that work is being performed in a structurally <br />acceptable manner. <br />Qualifcatlons <br />RB Engineering, Inc. is a structural engineering arm based in Cary, North Carolina and <br />Included with this proposal you will find any resume and a structural project list. In addition <br />to being completely qualified to perform this assignment from a structural engineering <br />perspective, our company also provides you with the following additional praject benefits: <br />• Since ~ will be acting as the project manager, a Professional Engineer will be actively <br />involved with every aspect of the repair prof ect. <br />• RB Engineering, Inc. has extensive experience with foundation and floor repairs, <br />including repair methods and procedures. <br />• I~B Engineering, Inc. has excellent working relationships with several local <br />foundation repair contractors. <br />• RB Engineering, Inc. has a working knowledge of local site conditions. <br />• RB Engineering, Inc, intends to create detailed construction documents while <br />minimizing the plan preparation tune and project management time to control design <br />Casts. <br />Labor & Expenses <br />Dur lump sum fee for consulting structural engineering to prepare a foundation repair plan <br />and project specifications in accordance with this proposal is ~7~,750. Also, this proposal <br />includes a contingency amount of up to ~1~OU0 for any additional engineering services <br />determined to be necessary as the project progresses for a maximum proposal amount of <br />~8,75U. The additional services would be billed at a X125 houri~rate. This proposal <br />includes the following list of tasks that will be performed by R.B Engineering, Inc. in order to <br />meet the objectives of the assignment: <br />• Initial site ~scoping}meeting with owner representatives <br />• Structural inspections <br />• Structural evaluation and repair design <br />• .Preparation of foundation and floor repair plans and praject specifications <br />• Provide construction documents to owner and attend apre-bid meeting <br />• Lirnlted construction inspections to address any structural issues <br />• Final inspection <br />Invoicing of engineering labor and expenses for engineering reviews on this assignment will <br />occur on the following basis: <br />0 <br />25% due at the start of the project <br />dS% due by the pre~bid meeting <br />10% due at the completion of the prof ect <br />