Browse
Search
NS Purchasing - Summitt Engineering Construction Services for Justice Facilities Expansion Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Purchasing - Summitt Engineering Construction Services for Justice Facilities Expansion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 2:48:24 PM
Creation date
5/26/2009 9:15:11 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Meeting Type
Work Session
Document Type
Contract
Agenda Item
4bb
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />• backfilling activities. <br />Foundation: <br />I. Observation. verification and testing of hearin~_ capacit? of ali foundations and pmvidin~ <br />recommendations ~~~here unsuitahle hearing conditions exist. if encountered. <br />'_. Provide observation and testin_: of concrete Burin, all ti~undation placements. includin_ <br />slump, air content. unit ~~eight. temperature and fabrication of compressive strem_th <br />cylinders. <br />3. As requested. verif~• the size, location and placement of reinforcing steel ~rithin finrndations. <br />-1. If encountered, quantify rock removed from the foundations and verify quantities .with on- <br />site personnel. <br />Concrete: <br />I . Provide sampling, testing and observation of concrete placements. including slump, air <br />a~ntent. unit weight. temperature and fabrication of compressiv=e stren_th specimens. <br />?. If needed: observe and document post-tensionin~~ activities. Report elongation data <br />immediately for review and approval b.' the Structural Engineer. <br />• .i. As requested, verify the size. location and placement of reinforcing steel <br />Structural Steel: <br />Provide continuous observation and testing of shop and field full and partial penetration <br />welds and multipass fillet.velds. <br />3. Provide visual weld inspection, shear stud testing:, and verify bolted connection as required <br />by the specification. <br />Sprayed Fire Resistant Materials: <br />I. Perform thickness testing in accordance with ASTM E605 at a rate of 35% of the structural <br />columns and beams as required by code and (test/10,000 sf on all other members. <br />'. Perform density and bond strength testing of the fireproofing in accordance with ASTM E <br />b0~ and ASTM E 7:6 at a rate of I test /10.000 sf on columns, beams and deck. <br />Please note, as you likely are aware, The Department of Labor, Occupational Safeh~ and <br />Health Administration has issued new mandatory requirements for steel erection, which <br />are effective as of Januar}• 18, 2002. 'this regulation affects the type and amount of <br />concrete testing required for steel structures. The following is an excerpt from 29 CFR <br />Part 1926. <br /> <br />Pa_t 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.