Browse
Search
S Purchasing - Corley Redfoot EMS 9-1-1 Center Upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Corley Redfoot EMS 9-1-1 Center Upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:37:56 AM
Creation date
5/22/2009 12:46:15 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6b
Document Relationships
Agenda - 09-19-2007-6b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 09-19-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 11 BASIS OF COMPENSATION. <br />The Owner shall compensate the Architect as follows: <br />§ 11.1 An Initial Payment of N/A <br />($ . ~/A )shall be made upon execution of this Agreement and credited to the Owner's account at final <br />payment. <br />§ 11.2 BASIC COMPENSATION <br />§ 11.2.1 For Basic Services, as described in Article 2, and any other services included in Article 12 as part of Basic <br />Services, Basic Compensation shall be computed as follows: <br />(bzsert basis of co»ipe~asatio~a, i~acluding stipulated su»zs, multiples or perce~ztnges, ii~zd identify phases to which <br />particular raiethods of cornperasatio~a apply, if ~zecessary.) <br />B~a.sis U.fL canpe9lsation is s stinulated:_ Burn of n.int't~y-ni.nc~ ~hc~usatzd dollars <br />($99,00'0.00). <br />Des.i~n .and ['nnstcuc t:ion Doct~nent Ph:~se: $69,300 <br />l3iddin~ ~has:~: 4,950 <br />Cons tr~ur tion .Adrninis l:ra Lion Przas;~ : 24, 750 <br /> $99,x00 == 100% <br />§ 11.2.2 Where compensation is based on a stipulated sum'o>• percentage of Construction Cost, progress payments for <br />Basic Services in each phase; shall total the following percentages of the total Basic Compensation payable: <br />(bzsert additio~aal phases as ceppropriate. ) <br />Sep breo.?ccio~an t~h:~ve. <br />Schematic Design: percent ( %) <br />Design Development Phase: percent ( _' '%)` <br />Construction Documents Phase: percent (. %) <br />Bidding or Negotiation Phase: percent. ( %) <br />Construction Phase: percent ( %) <br />Total Basic Compensation one hundred percent ( 100.00% ) <br />Sew ArLirle 1?_, 12.3, for list ol: Additional <br />§ 11.3 COMPENSATION FOR ADDITIONAL SERVICES Se-r_vioes an~3 costs of each s:~r~rice. kph . <br />§ 11.3.1 For Project Representation Beyond Basic Services, as described in Section 3.2, compensation shall be computed <br />as follows: <br />Frinc~pal's TimL: $~.?0/nour <br />Arch_iterr°s Time: $ 85/nour <br />En~i.nt~:~r's Tima: ~$110/nour <br />CAOD/Drs~tin~ Time: $ o5/nour <br />Constrt~t~r_ion Adrn:inistrarion: $ 75/nour <br />Ol~htr_ efnL~loyees n r f ~ ~P of 2.75 times ci:iret, ~ hourly wade . -_ <br />AIA Document B151TM -1997. Copyright ©1974, 1978, 1987, and 1997 by The American Institute of Architects. Ail rights reserved. WARNING: This <br />AIA®Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA`D Document, 13 <br />or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. <br />Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright v(olations of AIA Contract Documents, a-mail <br />The American Institute of Architects' legal counsel, copyright@aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.