Browse
Search
S Purchasing - Corley Redfoot EMS 9-1-1 Center Upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Corley Redfoot EMS 9-1-1 Center Upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:37:56 AM
Creation date
5/22/2009 12:46:15 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6b
Document Relationships
Agenda - 09-19-2007-6b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 09-19-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
time they are incurred or at any time. Therefore, and in <br />recognition of these factors and the likelihood that actual <br />damages from his delay will not be readily ascertainable, the <br />CMAR agrees to pay to the Owner, as Liquidated Damages <br />and not as a penalty, the sum of Two Thousand Five Hundred <br />Dollars ($2,500) as the Liquidated Damages per day, for each <br />day by which the failure to meet the Substantial Completion <br />Date shown in the Master Schedule, adjusted in accordance <br />with this Article, delays the Substantial Completion of the <br />Project. The sum for Liquidated Damages is the amount <br />reasonably estimated in advance to cover the, losses to be <br />incurred by the Owner by reason of failure of the CMAR to <br />complete the Project within the time specified, such time being <br />in the essence of this contract and a material consideration <br />thereof. <br />ARTICLE 5 <br />CHANGES IN THE CONSTRUCTION MANAGER'S <br />SERVICES AND ADDITIONAL COMPENSATION <br />5.1 Owner Changes <br />The Owner, without invalidating this Agreement, may make <br />changes in the CMAR's Services specked in Article 3 of this <br />Agreement. The CMAR shall within five (5) days notify the <br />Owner of any changes or other events which in the opinion of <br />the CMAR entitle the CMAR to an increase or decrease the <br />Guaranteed Maximum Price, the CMAR's compensation, the <br />duration of the CMAR's Services, or both. <br />5.1.1 Changes in the CMAR's Services <br />Changes in the CMAR's Services may be directed by the <br />Owner in writing, and if so directed to provide different or <br />additional Services the CMAR shall comply with the directions <br />of the Owner. Additional compensation shall be settled by a <br />written amendment to this Agreement executed by the Owner <br />and the CMAR. If possible, the amendment shall be executed <br />by the Owner and CMAR prior to the CMAR performing the <br />services required by the amendment, but failure to agree on <br />compensation for a change in Services shall not be grounds for <br />the CMAR to cease or refuse to provide the Services <br />reasonably requested by the Owner. The CMAR shall proceed <br />to perform the services required by the amendment only after <br />receiving notice directing the CMAR to proceed. <br />5.1.2 Additional Compensation and Extended Duration <br />The CMAR shall be entitled to receive additional compensation <br />and additional time when the scope or planned duration of <br />Services is increased or extended through the fault of the <br />Owner. The CMAR shall notify the Owner within five (5) days <br />after changes to the scope of the Project or a part thereof or <br />after delays caused in whole or in part by the Owner increase <br />or extend the scope or duration of the CMAR's Services. <br />5.1.2.1 Fixed Fee <br />The CMAR shall not be entitled to an increase in the Fixed Fee <br />unless and until it is finally determined at the completion of the <br />Project that the approved Cost of the Work exceeds one <br />hundred and five percent (105%) of the Cost of the Work set <br />forth in the original agreed Guaranteed Maximum Price. If an <br />increase in the Fixed Fee is just~ed, the CMAR shall be <br />entitled to an increase in .the Fixed Fee equal to <br />percent (_%) of the amount by which the final approved Cost <br />of the Work exceeds one hundred and five percent (105%) of <br />the Cost of the Work set forth in the original agreed <br />Guaranteed Maximum Price. The Owner may in its discretion <br />approve adjustments to the Fixed Fee prior to the end of the <br />Project. <br />5.1.2.2 General Conditions <br />The amount of additional General Conditions costs to be paid <br />to the CMAR and the amount of extension of the duration of <br />this Agreement shall be determined on the basis of the <br />CMAR's reasonable additional General Conditions costs after <br />determining the increased services and length of the <br />extensions of the duration of this Agreement. A change in the <br />Drawings and Specifications or other change in the scope of <br />the Work shall not automatically entitle the CMAR to an <br />increase in compensation. Increases in the compensation <br />payable to the CMAR shall only be payable upon proof of an <br />increase in the actual duration or level of services being <br />provided by the CMAR, or both. <br />5.1.2.3 Cost of the Work <br />Increases in the Cost of the Work shall be deterrnined in <br />accordance with the provisions of Article 7 of this Agreement. <br />5.1.3 Payment of Additional Compensation <br />The CMAR shall submit invoices for additional compensation <br />with its invoice for Services and payment shall be made <br />pursuant to the provisions of Article 7 of this Agreement. <br />ARTICLE 6 <br />OWNER'S RESPONSIBILITIES <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.