Browse
Search
S Purchasing - Corley Redfoot EMS 9-1-1 Center Upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Corley Redfoot EMS 9-1-1 Center Upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:37:56 AM
Creation date
5/22/2009 12:46:15 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6b
Document Relationships
Agenda - 09-19-2007-6b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 09-19-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORANGE COUNTY <br />NORTH CAROLINA <br />AGREEMENT FOR CONSTRUCTION <br />MANAGER AT RISK SERVICES <br />This AGREEMENT is made and effective on this date: <br />BETWEEN The Owner: <br />COUNTY OF ORANGE <br />And the Construction Manager At Risk (hereinafter referred to as "CMAR" or "the CMAR"): <br />Resolute Building Company, Inc,; PO Box 3656,-Chapel Hill, NC 27515 <br />For services in connection with the Project known as: <br />The Emergency Services/9-1-1 Center Upfit, Hillsborough, North Carolina, as further described in Article 2 <br />For which the Designer is: Corley, Redfoot Zack Architects and Engineers, 222 Cloister Court, Chapel Hill, <br />NC 27514 <br />The Owner and CMAR, in consideration of their mutual covenants herein, agree as set forth below: <br />TABLE OF CONTENTS <br />ARTICLE 1 -RELATIONSHIP OF THE PARTIES ......................................................................................... 4 <br />1.1 Owner and Construction Manager At Risk <br />1.2 Owner and Designer <br />1.3 CMAR and Contractors <br />1.4 Relationship of the CMAR to the Designer <br />ARTICLE 2 -PROJECT DEFINITION .......................................................................................................... 4 <br />ARTICLE 3-CONSTRUCTION MANAGER AT RISK'S SERVICES ................................................................... 5 <br />3.1 CMAR Services <br />3.2 CMAR Personnel <br />3.3 Construction Management Plan <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Management <br />3.7 Management Information System (MIST <br />3.8 Design Phase Services <br />3.9 Procurement Phase <br />3.10 Construction Phase <br />3.11 Post Construction Phase <br />3.12 Additional Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.