Browse
Search
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:31:07 AM
Creation date
5/22/2009 12:22:20 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E Page 28 of 32 <br />to the Contract Between Orange County and The Resolute Building Company for <br />Central Orange Senior Center Addition & SportsPlex Renovation <br />DIVISIon I I.- Equipment <br />COSC Addition and SpwUPlex Renovation - Gib Pmpoal <br />ploposal crRaft <br />1. The- Proposal does not Include sports equipment incl. basketball goal, sports storage <br />cabinets, coat racks, storage racks, vending equipment, kiln equipment beniches and <br />equipment In the concession area not specifically called out in the docurnenta. <br />Division Igo. Mechanical <br />HVAG DivIsloon <br />1. Lee Ales Sid proposal is attached to the VE options listing their interpretation to the design <br />Intent. VE CYptions taken by the owner include Items as Identillied by Lee Air, The enginor <br />and Lee Air have reviewed ft systems as designed and redrawn the controls and <br />equipment to reflect these savings, Lee Air to verify that these drawings do reheat the VE <br />Options they had offered. Lee Air will submit the duct design to the engineer font <br />verification and sign off before procaetfing. <br />Fite Protection Syste m, <br />I The Proposal Includes Fire Protection System The Proposal is based on the <br />understanding that exist im System wili support (appropriate flow capacity) the <br />modifications that may be mquired. Sprinkler ar.Azms are ardicipated to be 11,4ht hazard <br />occupancy. <br />2.. The proposal does not include fire pumps or retizing of existing pipes. <br />3. The Proposal antfclp s tying into the existing Fire Sprinkler Risers located In Room 165- <br />The Proposal has not anticipated installing any new backHow preventom or other devices <br />that are typically associated oath new construction, <br />4. The Proposal is based on leaving existing sprinkler mains and laterals In areas; that shall <br />be renovated. The intent Is that heads will be relocated without re-constructing, the entire <br />system. <br />Division 116: Electrical <br />The Proposal Is based ion modlfong (not replaping) the existing Fire Alarm Wstarn. <br />Eidstng devices shall be removed and relocated (re- used} wherever possible. <br />2. The Proposal is based an the existing telephons room rem - aInIng as is. New outlet boxes <br />will be. provided With empty stub up above accessible callings. The Proposal has <br />excluded new tolecornMunloation cablli3g, removal of abandoned cabling, equipment or <br />servers. <br />3. The Proposal excludes site parking lighting. lighting to be provided by the 100ai electrical <br />utility under direct contract with owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.