Orange County NC Website
Appendix E Page 26 of 32 <br />to the Contract Between Orange County and The Resolute Building Company for <br />Central Orange Senior Center Addition & SportsPlex Renovation <br />sk"OlAffri a Addition and SportaPlex Renovadon - GUIP Proposal <br />Inifitea*LM. UU%0*4 COW~' proposiall Criteria <br />11. The Proposal has excluded desIgnficonsultant fees, planning fees, usage tees, impact <br />fees, development fimm, capacity charges, escrows or tars (except material sales tax). <br />12. Tha Proposal has excluded- cleaning, testing, repairing, refurbishing, code upgrades and <br />recartification of existing systems or structures. If requested by the Owner, these items <br />may be added to the CWs scope of work later. <br />13. The Proposal has excluded any c*sft associated Wth Department of insurance Special <br />Inspections. This should be included Into the owners testing allowance. <br />14- The Proposal has excluded contingencies or allowances for the detection and removal of <br />hazardous material (i.e., asl�stos, lead paint, Mrs, mold, etc). It hazardous; materials <br />are anUcipatW. it Is recommended that the Oww consult to conduct an Investigation of <br />the facility and grounds. Should unforeseen abatement be requilred, the CM shall reserve <br />right to claim additional oontract time and costs should abatement be required once the <br />project has commenced. <br />15. The Proposal Includes testing and balancing of the WAG systems by the subcontractor. <br />The Proposal is based on the understanding that the Owner Wit pmvMo Third Party <br />Testing and Saiancing services If required. If requested by the Owner, this may be added <br />to the Ms scope of wo* later. <br />16. 'The Proposal has excluded materials testing and Inspections. The Proposal is based on <br />the understanding that the Owner Vill provide all material testing and Inspections. <br />17. The Proposal has excluded contingencies or allowances for premiums in cost associated <br />with QM, Subcontract or Vendor overtime or premium time, The Proposal does account <br />for certain project components That may requim brief premium time effort. <br />18. The Proposal has excluded. allowances for Licensed Met Land Surveys or Certifications. <br />If requested by the Owner, this may be. added to the CM's scope of work- Later. <br />Division 2: Slitework <br />The Proposal is based on the Owner removing and / or relocating all equipment, <br />furrdshings, or other ►ems not speofloWly oaltis-d out on the drawings or specifications prior <br />to the project commencement date. The intent Is to avoid any potential mlsunder standing <br />of what Is to be turned over to the Owner and what Is acceptable for remavaJ. If requested <br />by the Owner, help with removal may be added to the We scope of work later. <br />2. The Propossd Includes Light and Heavy Duty Asphalt Paving. Eight Duty paving has been <br />anticipated to, be 6" ABC subbase and 2" 1-2 a;sphalt**ftd1ng. Heavy Duty paving has <br />been anticipated to be $' ABC subbase and Z' 1-2 asphalt surfacing. As part of the VE <br />Options taken, only the main entrance, turning circle and drhm isle to the durnpater pad <br />has been consider-ad as Fleavy Duty. Proposed cost of asphalt matedal has been based <br />on North Carolina Department of Transportation terminal prices of $375 per liquid ton. <br />Adjustments to asphalt material cost may be required at a later date to reflect the DOT <br />index at that time. <br />