Browse
Search
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:31:07 AM
Creation date
5/22/2009 12:22:20 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E Page 25 of 32 <br />to the Contract Between Orange County and The Resolute Building Company for <br />Central Orange Senior Center Addition & SportsPlex Renovation <br />V%dw_dft COSC AddMon and Sport%Plex ftflovadon - 'SUP Proposal <br />111MOLUTIN Propoew CrIterta <br />T?A1WWL="WWWWWM <br />10. The Proposal is based on the CM and its Sijbcorrtmdors providing Indushy standard <br />twelve (12) Month WaMinty WhiCh Shall COMM01100 the f1fst day following the Substantial <br />Completion Date of the respective areas. <br />11. The Proposal Includes several ALLOWANCES. Certain allowances are Intended to be <br />furnish and install (provide) allowances v"e others may be intended solely for material or <br />labor, Refer to the Proposal for included allowances. <br />Division I., General ProjettCnted-a <br />I. The Proposal includes costs for the Building Permit. <br />2. The Proposal includes costs for Payment and Performance Bonds to be provided by tha <br />CM, <br />S. The Proposal Includes General Liability Insurance premiums. <br />4. The Proposal includes 60ders; Risk for that portion of work included in the contma <br />does not Include 'all peril" insurances for exlsftg structOrm <br />The Propcsal is based an reasonably dear and unobstructed use of the existing site and <br />taollity by the CM and Its SubcontractoTs for waste rem oval, material staging and <br />construction pgMmnel with the ultimate Intent of'maintaining construction seqr enw. and <br />time. The CM WU cooperate VWM the owner so as not to Interfere with ongoing business <br />operadons. <br />a- The Proposal Is based on material manufacturer's standard producW, prcifil", colors, Ott. <br />In general, Me Proposal has been compiled from industry standards that align with the <br />existing facility and the described design intent communicated to date. <br />7. During the demolition phase of the project, every effort will be Made to "saw. AN reuse <br />existing material i.e., door hardware. doors, storefront etc. The GMP price includes now <br />material as the CM cannot guarantee how much Rind what Will be able to be rOUSed. Once <br />the material is identified, the respective vendors and subcontractors; will be notified and <br />possible savings can be obtained. <br />8. The Proposal is based on the CM and Its Subcontractors being aftbrded the, opportunity, <br />throughout the dui Mtn of the PrOjW, tO 00VIdO -Wb,0tVti1(5n$ Of pmauM or rnamod-a that <br />may reasonably benefit the project. All substitutions shall be subirnitted to the owner and. <br />designer for approval along wft any savings. <br />The Proposal and Schedule are based on historically average weather Conditions. The <br />CM will endeavor to rninimize cost or time ImplIcations associated with abnormal weatber. <br />10. The Proposal has excluded permanent Lrfiky usage costs, Including but not UrWibsd to, <br />telephone, Internet, electricity, water, steam, sewer, ohiged water and gases, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.