Orange County NC Website
Appendix E Page 22 of 32 <br />to the Contract Between Orange County and The Resolute Building Company for <br />Central Orange Senior Center Addition & SportsPlex Renovation <br />RGOOLUTS COSC Addition and SportsPlex: Renovation - GMP Proposal <br />THE RESOLUTE BUILDING COMPANY <br />Unit Pricing <br />8/3/2007 <br />Item # Item Detail Description Unit Unit Price <br />Interior Slab on Grade - Minor Prep <br />Subgrade, place and grade stone, <br />install insulation and vapor barriers, <br />03305.01 <br />install reinforcing, place and finish, <br />ADD <br />SF <br />$ 1.25 <br />cure and seal, sawcut joints for slabs <br />as denoted on S1.1 and S1.2 Refer <br />to Bid Package for Requirements. <br />Interior Slab on Grade Trench/Infill <br />Place and Finish - place, finish, cure <br />03305.02 <br />slab on grades at locations where <br />ADD <br />SF <br />$ 1.25 <br />pourback Is required due to <br />underslab work by other trades. <br />Interior Slab on Metal Deck Place <br />03305.03 <br />and Finish - Install reinforcing, place, <br />ADD <br />SF <br />$ 1,25 <br />finish, and cure slab on deck as <br />denoted on S1.1 and S1.2 <br />03305.04 <br />i Pan Stair Place and Finish - place <br />ADD <br />Tread <br />$ 40.00 <br />and finish concrete for steel pans <br />ADD <br />03305.05 <br />Cast -in -Place Concrete Stair Place <br />LF Riser <br />$ 50.00 <br />and Finish - place and finish stair, <br />0 1 4810.01 <br />Lay 4" Block includes horizonatal <br />ADD <br />EA <br />$ 3.75 <br />and accessories <br />04810.02 !Lay 6" Block includes horizonatal <br />ADD <br />EA <br />$ 3.75 <br />ireinforcing and accessories <br />04810.03 <br />Lay 8" Block includes horizonatal <br />ADD <br />EA <br />$ 3.73 <br />reinforcing and accessories <br />04810.04 <br />Lay 12" Block includes horizonatal <br />ADD <br />EA <br />$ 4.50 <br />reinforcing and accessories <br />04810.05 <br />Lay Brick for masonry Veneer <br />ADD <br />per 1000 <br />$ 730.00 <br />count <br />04810.06 <br />Hourly Rate including all markups for <br />ADD <br />MH <br />$ 40.00 <br />Mason <br />04810.07 <br />Hourly Rate including all markups for <br />ADD <br />MH <br />$ 40.00 <br />Tender <br />04810.08 <br />Install Cavity Rigid Insulation Board <br />ADD <br />SF <br />I $ 0.15 <br />04810.09 <br />.Loofinq <br />Install Dampp <br />ADD <br />SF <br />$ 0.25 <br />04810.10 <br />Install Masonry ties on other framing <br />ADD <br />ADD <br />EA <br />$ 0.32 <br />04810.11 <br />Place block fill and install rebar <br />CY <br />$ 110.00 <br />--0-4810A2 " <br />Clean Masonry <br />ADD <br />SF <br />$ 0.32 <br />06402.01 <br />Base Cabinet and Counter Top <br />F&I ADD <br />LF <br />$ 145.00 <br />I Similar to Detail 2/A9.3. <br />H.XEXP\PROJECTSXCOSC%CorresNndence Arch & Ow erkConlract domments\Appsndix Ei4e-Unit PricingAs 2 of 3 <br />