Browse
Search
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:31:07 AM
Creation date
5/22/2009 12:22:20 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E Page 17 of 32 <br />to the Contract Between Orange County and The Resolute Building Company for <br />Central Orange Senior Center Addition & SportsPtex Renovation <br />Lee Air Conditioners, Inc. <br />P.O. Box 2895, Dtaham NC 27715 <br />5109 Neal Road, Durham NC 27705 <br />Ph: 919 -383 -1588 -1 Fax: 919- 383 -0448 <br />www.leeacxom <br />Proposal <br />August 16, 2007 <br />Resolute Building Company <br />PO Box 3656 <br />Chapel Hill, NC 27515 <br />Ref: Central Orange Senior Center Addition and Sportsplex Renovation <br />REVISED for VE <br />Attn: Mr. Anthony Wood <br />As requested, we have prepared an estimate based on plans dated 3/12/2007 and specifications for the <br />above referenced project: <br />BASE BID <br />We propose to provide the following: <br />1. RTU's 2 through 7, 11, 12 <br />2. Two (2) infrared heaters <br />3. Five (5) ceiling fans and four (4) roof fans <br />4. Five (5) baseboard heaters <br />5. DDC controls for base bid equipment <br />6. Remove CU -4 and AHU-4 to be stored on site until relocation to mezzanine <br />7. Demolition to include cutting duct loose to be dropped and removed by others <br />8. Provide load -side electrical wiring and disconnects <br />9. Install smoke detectors (provided by EC) <br />10. Install temporary exhaust fan for mezzanine ventilation (wiring by EC) <br />11. Permit Fees <br />12. One -year general warranty and five -year compressor warranty <br />13. Professionally engineered design drawings <br />TOTAL..... ............................... ....................$463,500.00 <br />Alternate 6 ................... ............................... $30,900.00 <br />Provide and install new RTU8 in place of old RTU -4 <br />Alternate 7 ................... ............................... $14,600.00 <br />Provide and install new RTU -1 in place of RTU -2 and 3 with duct modifications <br />Alternate 8.......... ...... ............................... $37,100.00 <br />Remove old RTU and install new RTU -10 to serve Locker Area <br />
The URL can be used to link to this page
Your browser does not support the video tag.