Browse
Search
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:31:07 AM
Creation date
5/22/2009 12:22:20 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Within thirty (30 days mfreceipt of any <br />shown at that time to be incomplete or.defective. deficiency list, the Contractor shall complete and correct all items on that list along with all <br />other Work required to achieve Final Completion of the Work. At any time prior to <br />completion of the period of warranty the CMAR may submit to the Contractor supplemental <br />deficiency lists, in which case the '6ontractor shall complete or correct any and all new <br />items identified on the supplemental deficiency lists within the time period stipulated in <br />paragraph 18.3 of these General Conditions. <br />ufFinal Payn�entshoUconstbuteowa�wrofoUo�hnobythe <br />213 �henmoh�gond000aptonce <br />CK8AR except: <br />a) Claims arising from unsettled liens or claims against the Contractor. <br />b) Defective Work or materials appearing ofterFina Payment. <br />C) Failure of the Contractor to perform the Work in accordance with the Contract <br />Documents. <br />d) Ay conditioned in the Performance Bond. <br />e\ Claims made prior \o Final Payment which remain unsettled. <br />f) Amounts due arising under Articles 18 and 28of these General Conditions. <br />Q) claims for recovery of overpayment based upon incorrect measurement, estimate, <br />or certificate. <br />whoUconat�ute��m�orofmUo�hnsbyUxe <br />214 |honnomnganou�p�puu/��"' ` "'�' ' ~ writing pursuant to paragraph 15.2 of <br />Contractor except those claims previously made in these General Conditions and not finally resolved. <br />unless m� m� (1) the Designer <br />215 |nmux«*�sna»/w`we`e*""""`"^'~'`~'^--'-''�—' �� at� thsdo|| � Una VVorkby <br />' based the Oesigne�mo�oenx�ionsand or <br />has ..�__ �� <br />w�wu= "���" `"' ~'~ �~~�'-- observations nd with the <br />"~~(�onb�ob�r under [;ontn�o Documents has been completed in accordance m� ^ <br />Contract Documents, mnd (1|) the Work by the Contractor has been approved by all federal, <br />state and local agencies having jurisdiction. <br />2 l' G The final Request for Payment oho17 be identified on its face as such and shall be <br />presented by the Contractor bm the CWAR within thirty (3O) days of completion of the Work. <br />Final payment of the retained amount due the Contractor shall be mode by the CMAR <br />within thirty (30) d"x~ after the later of U\ full and Final Completion of all Work required o� <br />the Contractor by the Contract Documents, and norUUuabon of such Work in accordance <br />with paragraph Zl'5; (ii) submission cf the affidavits and other documentation required by <br />Article 32|(i) submission b the Contractor v' o Request for Payment identified on its face <br />as final. <br />ARTICLE 22. CONTRACTOR, SUBCONTRACTOR AND SUPPLIER AFFIDAVIT <br />22.1 The Final Payment due the Contractor on account of the Contract Documents shall not <br />become due until the Contractor has furnished to the CMAR: (A) an affidavit by the <br />Contractor signed, sworn, and notarized to the effect that all payments for materials, <br />services, or for any other reason in connection with the Work or performance of the <br />Contract Documents have been satisfied and that no claims or liens exist against the <br />Contractor �~'---- <br />signed, sworn, and notarized to the effect that U~ \ each such Subcontractor mr supplier has <br />been paid in full by the Contractor for all Work performed and/or materials supplied byb|n <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 37 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.