\ ,> <br />13.13 The Contractor ������������me������� <br />Co�����r'delays arising from unforeseen causes beyond the control and without <br />the fault or negligence of the Owner, the Designer, the CKAAR' the Contractor or the <br />Contractor's Subcontractors amfollows: <br />a) Labor disputes and strikes that directly impact the critical path activities of the <br />Master Schedule; . <br />b) Acts of God, bmnnado, fina, hurdcone, blizzard, earthquake, typhoon, or flood that <br />damage completed Work or stored materials. <br />C) Acts of the public enemy; acts of the SUote. Federal, or |omd government in their <br />sovereign capacities. <br />d\ Abnormal inclement weather oo defined |n Article 13.i4. <br />13.14 On any day that the Contractor considers that the Project is delayed by adverse weather <br />conditions, the Contractor shall kienUh/ in writing to the CMAFl the odvanem vxnothar <br />conditions affecting each aotiv|ty, the specific nature of the activity offenbed, the number of <br />hours |nst, and the number pfand identity (by responsibility or trade) of workers effeob*d <br />and shall obtain from the CMAR written recognition of the delay. The time for performance <br />of this Contract includes on allowance for a number of calendar days which may not be <br />suitable for construction Work by reason of adverse vvmedhar. The Contract Time will be <br />extended only if the number of calendar days of adverse weather recognized by the CMAR <br />exceeds the number of indannoni weather days eat forth below, and the Contractor <br />demonstrates how this adverse weather impacts activities nn the critical path of the Master <br />Schedule. <br />Month <br />Number of Inclement Weather Da <br />January <br />' <br />February <br />p <br />March <br />/ <br />April <br />G <br />May <br />7 <br />June <br />6 <br />July <br />8 <br />August <br />G <br />September <br />5 <br />October <br />5 <br />November <br />5 <br />December <br />9 <br />13.15 If the Contractor believes that the progress of the Work has been adversely affected by <br />adverse weather recognized by the CMAR during a particular month, the Contractor shall <br />submit a written request for extension of time to the CMAR. Such a request for time <br />extension of the Contract Time shall be submitted by the tenth (10th) day of the month <br />following that month in which the adverse weather is encountered. The request shall <br />include, but is not limited to, the following information: <br />8) Detailed description of weather's effect on scheduled activities and its net effect on <br />the critical path of the Project, and <br />b\ Weather records from the official weather station nearest the Project site and <br />records of actual observation as contained in daily nepodw, oononpondenma, or <br />other documentation. <br />/ <br />) <br />� GENERAL CONDITIONS FOR CM AT RISK PROJECT 28 of 42 JUNE 2007 EDITION <br />