Orange County NC Website
� <br />` <br />shall pay all bills for its consumption of water, electricity, or other public utility service to the <br />Project site. <br />7' 26 The Contractor ohe| indemnify and hold the CMAR. the [wnmr, the Deeigner, the <br />Designers oonoultonba, and their respective officers, agents, and employees harmless <br />against all costo, damages, and expenses, including attorney's fees and costs of defenoo, <br />arising out of claims by any separate contractor or by any Gubcontrocbzr, sub- <br />subcontractor, or supplier engaged by or employed by the Contractor or employed by any <br />of the Subcontractors claiming through h|nm, including without limitation damages, losses, <br />and expenses arising out nfor relating bz any inconvenience, delay, interference, orother <br />action or non-action of the Contractor or the Contractor's Subcontractors on the Project. <br />The Contractor acknowledges that should the Contractor or any of the Contractor's <br />Subcontractors be damaged by any breach of contract by any other separate contractor on <br />the Project, the Contractor may invoke applicable dispute resolution procedures with said <br />other separate contractor. <br />7' 27 Prior to completion of the Work and Final Payment of the Contract Contract Price, excepting only <br />those portions of the Work deemed accepted in accordance with the Contract Documents, <br />the Contractor ohoU have charge and core of the Work, and nheU take every precaution <br />against injury or damage to any party due to the action of the elements or from any other <br />m*uoe, whether arising from the execution or from the non-execution of the Work. The <br />Contractor shall, as required by the CK8AR, rep|ace, nmbu||d, repair, meatora, and make good <br />all injury or damage to any portion of the Work occasioned by any of the above causes <br />before Final Completion and shall bear the expenses thereof. <br />728 |n the event that the Work, or any portion thereof, is suspended at any time pursuant boan <br />order of the Owner, the Contractor ehoU obey all instructions of the CK0AR regarding <br />storage of materials, drainage, protection of the Work, and erection of temporary structures <br />during the suspension period. <br />7.29 The CMAR shall be responsible for the coordination of the Work of the separate <br />contractors, both as to space and time. The CMAR shall incorporate the Contractor's <br />Construction Schedule into the Master Schedule and coordinate the implementation of the <br />Contractor's Construction Schedule. The CMAR shall also coordinate close-out of the <br />Project, including but not limited to all testing, inspection, certifications, and approvals <br />required by public agencies. <br />The Contractor shall notify the ' of ' eva�m���mw�hc�da�� the conduct or progress of the Work and shall cooperate fully with the CK8AR and all other <br />separate contractors on the Project site. <br />7.30 The Owner has �����|����������d����� <br />VVorknot mxpreoo -ervmdtotheOwnerbyoiharpuoviskmsofthmCmntrantDo:ummn1m. <br />7' 31 AJI Work performed pursuant to the Contract Documents shall conform in all respects to the <br />North Carolina State Building Code and all other state, local, and national codes in effect at <br />the time of and applicable to this Work. <br />7' 32 The CMAR shall coordinate and supervise the installation of all sleeves, inserts, chases or <br />other components of the Work needed for mechanical, plumbing, electrical or other work by <br />the various contractors. The responsibility fwraxact|ocoiionofsuchibarnsohaDbethsdof <br />the mechanical, p\umbing, electrical or other prime contractor that requires the |tonn for <br />passage or support of its work. Generally, the mechanical, p|urnb|ng, electrical or other <br />contractor that requires such items for support or passage of its work shall set its sleeves, <br />inserts, chases or other devices. |f necessary to maintain the progress of and complete its <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 23 of 42 <br />JUNE 2007 EDITION <br />