Orange County NC Website
maintaining progress of the Project on schedule and to complete the Work and the Project <br />by the specified Completion Dates. The Contractor shall be prepared to assess progress of <br />the Work as required in the Contract Documents and to recommend remedial measures for <br />correction of progress as may be appropriate. The CMAR shall preside as chairman and <br />arrange for minutes to be taken and circulated. <br />� the Wo��d�$�Om�f�m��a�A. the �n�o� <br />--- -'—' - ��' '�ot| os�[mrb�eight(4�)hounoinadv�nceoYreoumingoperebons <br />ehaUnubh'theC�K� mos� ` . <br />Should the terms of the Contract Documents require completion of one or more portions of <br />the Work for the Benefimie\Occupancy of the Owner prior tm completion of the entire Work, <br />the Contractor shall complete such pod|on(a) of the Work onnr before the date specified. <br />Such completion shall include the obtaining of all government or other permits, permission, <br />and/or approvals necessary to occupancy. The Contractor shall independently estimate the <br />difficulties involved in arranging the Work to permit such Beneficial Occupancy and shall <br />nou u| min any additional compensation or time extension by reason of any delay or <br />increased cost -due b'm- completing such portbm(o) ofthe Owner's possession mnd <br />use mf such ,-rbon(a) of the Work shall not be deemed an acceptance of any Work not <br />completed in accordance with the Contract Documents. The Owner shall be responsible for <br />the security, maintenance, utilities, and insurance uf all portions nf the Work completed and <br />beneficially occupied by the Owner. <br />712 The Contractor shall pay all license fees and royalties, and assume all costs incident to the <br />use of any invention, design process, or device which is the subject of patent rights or <br />copyrights held by others, except for inventions, design processes, or devices specified by <br />the Designer in the Contract Documents. The Contractor shall indemnify and hold harmless <br />the CMAR, the Owner, the Designer, and anyone directly employed by any of them, from <br />-- <br />and against �|nm�m.oamoos losses and '__ and _-_ <br />ofdefenea- ah�ngoutof damages, � nAamenturo||egad�fhngen�ontofnuuhr�ht du�ngor <br />after uomp'ebonof the VVork'and shall defend all such claims |n connection with any actual <br />or alleged infringement of such rights. <br />7' 13 The Contractor shall secure and pay for all permits, including without limitation construction <br />permits and |iownmen ' and will pay all governmental charges and inspection fees necessary <br />for the prosecution of the Work. <br />714 ����r��|(�������wh ahw.oae,me a <br />' reg ulatio ns applicable to the Work and shall protect and indemnify the CMAR, the Owner, <br />the Designer, and their respective officials, officers, agents, employees or servants against <br />any claim or liability arising from or based on the violation of any such law, ordinance, <br />regulation, order, or decree, whether by the Contractor or by the Contractor's employees, <br />Subcontractors, sub-subcontractors, or their employees. <br />7.16 The Contractor shall be responsible for the reasonable and necessary protection and <br />security of its Work and its property and the property of others at the site, as required by <br />laws or ordinances governing such conditions, or by custom or sound construction <br />practices, and shall share such responsibilities for protection of property at the site as may <br />be directed by the Contract Documents and the CMAR. The Contractor shall be <br />responsible for any damage to the Owner's property, or that of others, by the Contractor or <br />the Contractor's employees, Subcontractors, sub-subcontractors, or their employees or <br />agents, and shall make good such damages. The Contractor shall be responsible for and <br />pay for any such claims made against the CMAR or the Owner. <br />7.16 The �- ' Safety Program and Public Hazard Control <br />Plan implemented by theu MAR' The Contractor oho|( protect existing knpnnenenz _ <br />/ <br />\ ' <br />� <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 20 of 42 JUNE 2007EDITION <br />