Browse
Search
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:31:07 AM
Creation date
5/22/2009 12:22:20 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
written request of the CMAR, be removed forthwith by the Contractor, Subcontractor, or <br />sub-muboonbacbor employing such person without cost to the CMAR, and shall not be <br />employed again in any portion of the Work without the prior written approval of the CMAR. <br />Should the Contractor fail to nannmve such person or persons or fail to furnish suitable and <br />sufhn|e t ' for � Mhe proper prosecution of the Work within three (3) days after <br />n n <br />order, the CK8/\R may withhold further payment bywritten notice until compliance <br />with such order. <br />7.4 |f, in the opinion of the CK8&R, the Designer or the Owner, any Subcontractor on the <br />Project is incompetent or otherwise unsatisfactory, such Subcontractor shall be replaced by <br />the Contractor with no increase in the Contract Pdoa if and when directed by the CYNAR in <br />writing. <br />7.5 The Contractor ohoU furnish all rnaber|a|e. equipment, labor, transportation, construction <br />equipment <br />machinery, ond mach|n�� tools appliances, h/s0. |iQht, heat, and all other facilities and <br />incidentals necessary for the enenuUon, mointenonoe, in|Uo| operation, and completion of <br />the Work, other than those specifically excluded by the Contract Documents and to be <br />furnished by the CYWAR or others. When use or storage of hazardous materials or <br />equipment or methods of more than ordinary risk are necessary in accomplishing the Work, <br />the Contractor shall give the CyWAR reasonable advance notice. <br />If any materials are to be furnished minstalled by the CMARm others under the terms of <br />the Contract Documents, said materials shall be made available to the Contractor edthe <br />location(s) specified in the Contract Documents. All costs of handling, bonopwdotun from <br />the specified location to the Project, storage, and installing of materials furnished by others <br />shall be included in the Contract Price. The Contractor shall be responsible for any <br />demurrage, damage, |oem, or other deficiencies which may occur during the Contractor's <br />handling, storage, or use of material furnished by others. The CMAR shall deduct from any <br />monies due or to become due the Contractor any cost incurred by the CyWAR in making <br />good any such damage, loss, ordeficiency. <br />All equipment �����t����������o�ea�� <br />such mechanical condition as to meet the requirements of the Work and produce m <br />satisfactory quality of work. Equipment used on any portion of the Work shall be such that <br />no injury to previously completed Work, adjacent property, or existing facilities shall result <br />from its use. <br />When the methods and equipment to be used by the Contractor accomplishing the Work <br />are not prescribed in the Contract Documents, the Contractor shall be free to use any <br />methods or equipment that will accomplish the Work in conformity with the requirements of <br />the Contract Documents. <br />When the Contract Documents specify the use of certain methods and equipment, such <br />methods and equipment shall be used unless others are authorized in writing by the <br />CMAR. If the Contractor desires to use e method or type of equipment other than that <br />specified in the Contract Documents,.the Contractor may request authority from the CMAR <br />to do am. The request ohoU be in writing and mheU include o full description of the methods <br />and equipment proposed and of the reasons for desiring to make the change. If approval is <br />given, it shall be on the condition that the Contractor shall be fully responsible for producing <br />Work in conformity with the requirements of the Contract Documents, |t after trial use of <br />the substituted methods or equipment, the CMAR or the Designer determines that the Work <br />produced does not meet the requirements of the Contract Documents, the Contractor shall <br />discontinue the use of the substitute method or equipment and aheU complete the <br />remaining Work with the specified methods and equipment at no additional cost to the <br />Owner. The Contractor ehmU remove any deficient Work and replace it with Work of <br />\ / <br />�— <br />GENERAL CONDITIONS FOR CKAAT RISK PROJECT 18of42 JUNE 2OU7EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.