S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Purchasing - Resolute Building Company Central Orange Senior Center & Sportsplex Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:31:07 AM
Creation date
5/22/2009 12:22:20 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
environmental hazards, and make such changes in the Drawings and/or Specifications as <br />they may find necessary ho abate, uamodiob* isolate mr handle the environmental hazards. <br />Any |nonoomo or decrease in the Contract Price or the Contract Time resulting from such <br />changes shall be adjusted in the manner provided herein for adjustments as to extra and/or <br />additional Work and changes. It is agreed that the Contractor shall have no liability under <br />this Agreement for any environmental hazards existing et, on or in the Project site prior to <br />the dote that Work commences under this AQnaornent unless the Contractor or its <br />Subcontractors, agents or employees, acting alone or in concert with others, by their own <br />negligence or m|eoonduut, ndmaoe or expose the Owner or third parties to the <br />environmental hazards. <br />The provisions of this paragraph 5.4 shall survive the termination or cancellation or <br />completion nf this Agreement. <br />ARTICLE 6. OTHER RECORD DOCUMENTS AND SUBMITTALS <br />6.1 The CMAR shall furnish to the Contractor the number of copies of Drawings and <br />Specifications stated in the Supplementary Conditions. Additional copies ofDrawings and <br />Specifications may be obtained at the cost of reproduction and handling. <br />8.2 The Contractor ehoU submit to the CN1AR for forwarding to the Designer all Submittals <br />required by the Contract Documents. The Contractor shall submit four (4) reproducible <br />prints of all shop drawings plus the number of copies sufficient for its requirements. The <br />Contractor shall submit samples in quantities required by the Contract Documents. The <br />Contractor shall submit product date in five (5) copies, plus the number of copies sufficient <br />for the Contractor's requirements. All shop dnovvinQo nhoU be reviewed by the Contractor <br />and shall bear the Contractor's stamp of approval before being forwarded to the CMAR and <br />the Designer. Submittals shall be submitted in such time as to cause no delay to the Work <br />or any part thereof and in accordance with the Contractor's Construction Schedule and <br />Submittal Register. The CMAR shall review and process the submittal with reasonable <br />prommptneaa, noting desired corrections, if any. The CyWAR shall retain three (3) copies of <br />the aubrn|Mm| and shall return the balance of the reviewed submittal to the Contractor for <br />action. The Contractor shall furnish any corrected submittal to the CMAR for forwarding to <br />the Designer. The CK8AR shall retain three (3) copies of the corrected submUtal for the <br />records of the CyNAR and the Deoigner, and will return the balance of the reviewed <br />submittal bo the Contractor. <br />Subject to paragraph 6.3 herein, no substitutions will be accepted after the bids have been <br />received. All substitutions prior to the receipt of bids shall be in accordance with the <br />Contract Documents. <br />The Contractor acknowledges that the processing of shop drawings and other submittals is <br />directly impacted by the clarity, completeness, and accuracy of said documents and that it <br />is the Contractor's responsibility to (i) review and cqund|nota each submittal with all other <br />related or affected Work and (||) approve each submittal before submitting same to the <br />CKUAR for approval. <br />62 No substitutions and no deviations from any requirement of the Contract Documents shall <br />be deemed allowed unless the Contractor has specifically informed the CMARin writing of <br />such deviations ot the time of submittal and the Designer and the Owner have given written <br />and specific approval to the substitutions or deviations. In proposing e deviation or <br />substitution, the Contractor warrants to the CMAR, notwithstanding any review, allowance <br />or approval by the Designer or the Owner, that the deviation or substitution is at least equal <br />toorbetter in quality and for the purpose intended, and that the Contractor shall not by <br />reason of any such review, allowance or approval be relieved from any obligation or <br />responsibility contained in the Contract Documents. <br />/ <br />� <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 16 of 42 JUNE 2007 EDITION <br />