Browse
Search
NS Contract - Purchasing & Summit Engineering Northern Park Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Contract - Purchasing & Summit Engineering Northern Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:16:21 AM
Creation date
5/21/2009 12:47:16 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4s
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Concrete: <br />14. Standard Compressive Strength (ASTM C 39) $ 15.00 ea. <br />15. Compressive Strength Cube $ 17.00 ea. <br />16. Compressive Strength Grout Prism $ 50.00 ea. <br />17. Compressive Strength Core Specimen . $ 50.00 ea. <br />18. Concrete Beam, Modules of Rupture $ 40.00 ea. <br />Asphalt <br />19. Density Cores (ASTM to 2726) $ 35.00 ea <br />C. Miscellaneous <br />20. Overtime <br />Saturdays and excess of 8 hrs. /day Time &'/z <br />Sundays and Holidays Double Time <br />21. Mileage ~ $0.47/mi. <br />22. Direct Expenses Cost + 15% • <br />23. Coring Equipment -Coring Gun, Generator $250.00/day <br />Pricing for Additional Tests can be quoted upon request. <br />NOTES: <br />1. Unit prices are in effect for 12 months from date of proposal. <br />2. All rates are billed on a portal to portal basis. <br />3. Scheduling of field testing and observation services is required no less than the <br />working day prior to the date the services are to be performed. <br />4. Services cancelled without advance notice will be assessed a minimum 2 hour <br />charge. <br />5. A minimum charge of 2 hours applies to field testing and observation services. <br />6. For construction materials testing and observation services, an engineering review <br />charge to schedule and supervise personnel and evaluate and review reports will be <br />billed at a minimum of 0.5 hour per report issued. Concrete compression testing will <br />be charged 0.2 hour of review time for a set of cylinders. <br />Schedule of Standard Rates • <br />Feld and Laboratory Testing Services <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.