Browse
Search
NS Contract - Summit Engineering Construction Materials Testing Sportsplex & Orange Sr Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Contract - Summit Engineering Construction Materials Testing Sportsplex & Orange Sr Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:40:07 AM
Creation date
5/20/2009 12:32:59 PM
Metadata
Fields
Template:
BOCC
Date
10/9/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4o
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />construction engineering and inspection personnel working on projects across the state. Our <br />• technicians are certified in areas of concrete testing. asphalt pavement placement, soil densit}~, <br />.4 BC sampling, borrow pit sampling. OSHA safei}•. radiolo_ical safety and ~~au~,e use, and <br />erosion control implementations. <br />PROPOSED PROJECT PERSONNEL <br />Summit will assign Mr. Don Dewey, a Professional Engineer with over 18 years of relevant <br />experience to serve as the project manager for this project. He will coordinate all testing <br />activities including providing specific instructions to Summit personnel, revie~~~ing all field <br />reports for accuracy and completeness, resolvin_ any questions or problems as they develop. and <br />preparing summary• reports of obsen-anon and testing activities at regular intervals. <br />Summit will assign an engineering technician ~~ho has extensive experience ~~ith this t.pc of <br />building construction. The technician assigned to the project becomes a key project team player <br />and should be able to make expedient and appropriate recommendations that could otherwise <br />holdup construction activities. <br />Summit Consulting Engineers swill provide the specified construction materials testing from our <br />Hillsborough office located only a few hundred feet from the project site. <br />SCOPE OF SERVICES <br />• Based upon our experience on similar projects, the services Summit expects to provide would <br />inchrde, but not be limited to the following work elements: sitework, foundations, cast-in-place <br />concrete, structural steel and paving. Our primary objective is to verify that the work is <br />performed and installed in accordance with the project documents. <br />The services Summit expects to provide would include but not necessarily be limited to the <br />following: <br />1. Observing proofrolling activities of subgrade soils prior to fill placement. <br />2. Determining extent of unsuitable soils and documenting quantities with field personnel. <br />3. Performing soil compaction testing during sitework operations. <br />4. Verification of foundation excavations for bearing capacity. <br />~. Verification of the size and general arrangement of reinforcing steel per project plans and <br />specifications. y <br />6. Performing standard concrete tests including slump. air, temperature and fabricating <br />compressive strength cylinders per the specification. <br />• Page 2 of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.