Orange County NC Website
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the <br />Contract. The Contract Sum shall be Two Million One Hundred Sixty-eight Thousand Ninety Dollars and Zero <br />Cents ($ 2,168,090.00 ), subject to additions and deductions as provided in the Contract Documents. <br />PAGE 3 <br />Alternate No.l: Reclaimed Heart Pine Framing Members <br />Alternate No 2: Reclaimed Heart Pine Decking & Ceilins? <br />Alternate No 3: Reclaimed German Siding_ <br />Alternate No 5: Reclaimed Heart Pine Floorint; <br />Fill Material. on site borrow <br />Fill Material. off site borrow <br />Open Cut Rock Excavation <br />Trench Rock Excavation <br />Pit/Footing Rock Excavation <br />Replace Unsuitable Soils <br />Cut soil and remove off site <br />#57 Stone Backfill <br />Lean Concrete Backfill <br />§ 5.1.3 <br />vr-acraicnizna~rt'c~aTn=c=scv a:eZV~tfaEi9i i36t la~eF taan the da~sf the <br />than ~ ~ a ..we..+r.e n~,.t,:.e,....e,.e:..e~ «t,e n....t:,.,,«:,... c ~ u,,..,.,e„* The Owner shall make monthly payments <br />rr <br />to the Contractor within 25 days of receipt of an accurate Architect-approved Application for Payment. The <br />Contractor shall submit an accurate Application for__Payment to the Architect no later than the 25'~ of each month. or <br />11 Der cubic vazd <br />$22 per cubic yazd <br />$250 ~r cubic yard <br />$300 per cubic yazd <br />$250 per cubic yazd <br />$27.50 per cubic yazd <br />$27.50 per cubic yazd <br />$60 per cubic yazd <br />$200 per cubic yard <br />other mutually agreed upon date. <br />.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by <br />multiplying the percentage completion of each portion of the Work by the share of the Contract Sum <br />allocated to that portion of the Work in the schedule of values, less retainage of Five percent <br />5.00% .Pending final determination of cost to the Owner of changes in the Work, amounts not in <br />dispute shall be included as provided in Section 7.3.8 of AIA Document A201-1997; <br />.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and <br />suitably stored at the site for subsequent incorporation in the completed construction (or, if approved <br />in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less <br />retainage of Five percent (5.00% ); <br />PAGE 4 <br />Refer to Article 31 of the General Conditions of the Contract. <br />PAGE 5 <br />( TB~ per annum -Refer to Article 33 of the General Conditions of the Contract. <br />• <br />• <br />Additions and Deletions Report for AIA Document A101 TM -1997. Copyright ®1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, <br />1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and <br />International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal <br />penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:20:26 on 12/17/2007 <br />under Order No.1000325939_1 which expires on 10/14/2008, and is not for resale. <br />User Notes: (965695570) <br />