Orange County NC Website
§ 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated <br />• below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is <br />located. <br />(Insert rate of interest agreed upon, if any.) <br />( TBD )per annum -Refer to Article 33 of the General Conditions of the Contract. <br />(Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws <br />and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and <br />elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions. or <br />modijications, and also regarding requirements such as written disclosures or waivers.) <br />§ 7.3 The Owner's representative is: <br />(Name, address and other information) <br />Pamela K. Jones <br />Director of Purchasing & Central Services <br />County of Orange <br />129 East King Street <br />P.O Box 8181 <br />Hillsborough, NC 27278 <br />§ 7.4 The Contractor's representative is: <br />(Name, address and other information) <br />William Schmidt <br />324 Blackwell Street Suite 1200 <br />Durham, NC 27701 <br />§ 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the <br />other party. <br />§ 7.6 Other provisions: <br />ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS <br />§ 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, aze enumerated as <br />follows: <br />§ 8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and <br />Contractor, AIA Document A101-1997. <br />§ 8.1.2 The General Conditions are "General Conditions of the Contract" as contained in the project manual dated <br />June 26, 2007, section 00003 inclusive of appendices (A-D). <br />§ 8.1.3 The Conditions of the Contract are those contained in the Project Manual dated June 26, 2007 and are as <br />follows <br />Document Title Pages <br />Orange County Solid Waste General Notes and <br />Operations Center Specifications <br />• I § 8.1.4 The Specifications aze those contained in the Project Manual dated June 26, 2007 as in Section 8.1.3, and are <br />as follows: <br />AIA Document A101TM -1997. Copyright ®1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1987, 1974, 1977, 1987, 1991 and 1997 by The American <br />tMt. Institute of Architects. All rights reserved. WARNING: This AIAe Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 5 <br />reproduction or distribution of this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the <br />~ maximum extent possible under the law. This document was produced by AIA software at 11:20:26 on 12/17/2007 under Order No.1000325939_1 which <br />expires on 10/14/2008, and is not for resale. , <br />User Notes: (965695570, <br />