.3 Subtract the aggregate of previous payments made by the Owner; and <br />.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment • <br />as provided in Section 9.5 of AIA Document A201-1997. <br />§ 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under <br />the following circumstances: <br />.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the <br />full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete <br />Work, retainage applicable to such work and unsettled claims; and <br />(Section 9.8.5 of AIA Document A201-1997 requires release of applicable retainage upon Substantial <br />Completion of Work with consent of surety, if any.) <br />.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the <br />Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document <br />A201-1997. <br />§ 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: <br />(If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from <br />the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract <br />Documents, insert here provisions for such reduction or limitation. ) <br />Refer to Article 31 of the General Conditions of the Contract. <br />§ 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for <br />materials or equipment which have not been delivered and stored at the site. <br />§ 5.2 FINAL PAYMENT . <br />§ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the <br />Contractor when: <br />.1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct <br />Work as provided in Section 12.2.2 of AIA Document A201-1997, and to satisfy other requirements, <br />if any, which extend beyond final payment; and <br />.2 a final Certificate for Payment has been issued by the Architect. <br />§ 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the <br />Architect's final Certificate for Payment, or as follows: <br />ARTICLE 6 TERMINATION OR SUSPENSION <br />§ 6.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document <br />A201-1997. <br />§ 6.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-1997. <br />ARTICLE 7 MISCELLANEOUS PROVISIONS <br />§ 7.1 Where reference is made in this Agreement to a provision of AIA Document A201-1997 or another Contract <br />Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract <br />Documents. <br />init. AIA Document A101TM~ -1997. Copyright ®1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991 and 1997 by The American _ <br />Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 4 <br />reproduction or distribution of this AIA° Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the <br />~ maximum extent possible under the law. This document was produced by AIA software at 11:20:26 on 12!17/2007 under Order No.1000325939_1 which <br />expires on 10/14/2008, and is not for resale. <br />User Notes: (965695570) <br />