Browse
Search
Agenda - 05-19-2009 - 4q
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 05-19-2009
>
Agenda - 05-19-2009 - 4q
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:03:46 AM
Creation date
5/18/2009 12:19:26 PM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4q
Document Relationships
2009-029 Planning - NCDOT - Grant Agreement Endorsing Congestion Mitigation and Air Quality (CMAQ)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090519
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
S Agreement - Planning - Resolution Endorsing Congestion Mitigation and Air Quality (CMAQ) Grant Agreement with the NCDOT 05-19-2009-4q
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\BOCC Grants\2000 - 2009\2009\2009 Grants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qa <br />• The County shall be responsible for designing an erosion control plan if required by the <br />North Carolina Sedimentation Pollution Control Act of 1973, North Carolina General <br />Statute 113A, Article 4, incorporated in this Agreement by re#erence at <br />www.ncleg.netlaascriots/Statg~~~lStatutes.esp and obtaining those permits required <br />thereby in order to construct the Protect. During the construction of the improvements, <br />the County, and its contractors and agents, shall be solely responsible far compliance <br />with the provisions of said Act and the plan adopted in compliance therewith. <br />10. RIGHT OF WAY f UTILITY AUTHORIZATION <br />if the costs of right ofway acquisition or utility relocation are an eliglbte expense, the County shall <br />submit a letter of request to the Department to authorize and set up right of way andlor utility <br />funding. The acquisition for right of way, construction easements, andlor uta7ity relocation may be <br />undertaken only after the County receives written authorization from the Department to proceed. <br />11. PROJECT LIMITS AND RIGHT OF WAY (ROW) <br />SPONSOR PROVIDE ROW <br />The County, at no liability whatsoever to the Department, shall be responsible for providing andlor <br />acquiring any required right ofway andlor easements far the Project. <br />TIME FRAME FOR ROW ACTIVITY <br />The County wi}I accomplish all ROW activities, to include certiFcation of ROW, within 6 months of <br />execution of this Agreement. <br />RIGHT OF WAY GUIDANCE <br />The County shall accomplish ail right of way (ROW} activities, including acquisition and <br />relocation, in accordance with the following: Federal Aid Policy Guide, Title 23 of the Cvde of <br />Federa! Regulations, Part 710, Subpart B, and Trtle 49 of the Code of Federal Regulations, Part <br />24, [tJnfform Act] incorporated by reference at www.ft~wa.dot.goo/€egsr,~g3(~Le~[yes/faoatoc.htm; <br />North Carolina General Statutes, Chapter 133, Article 2, Sections 133-5 through 133-18, <br />Relocation Assistance, incorporated by reference at <br />Agreement 1D # 149 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.