Browse
Search
Agenda - 05-19-2009 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 05-19-2009
>
Agenda - 05-19-2009 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2009 12:17:40 PM
Creation date
5/18/2009 12:17:39 PM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
Minutes - 20090519
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 <br />j (<<STRUCTIONS FGR COlv1PLETlNG PETITION:--__,._.__.~_ _______.._ 1 <br />1. Complete intcrmation Secticn <br />2. Identify Contact Person (This person serves as spokesperson for petitioner(s)). <br />3. Aftach four (4) copies of recorded subdivision plat or property deeds, which refer to candidate road. <br />~. Ad}eiring preperfy owners and/or the developer may submit a petition. Subdivision roads with prior <br />NCDOT review and approval only require the developer's signature. <br />5. if submitted by the developer, encroachment agreements from all utilities located within the right of <br />~~~ay shall be submitted with the petition for Road addition. Nawever, construction plans may not be <br />required at this time. <br />6._ .Submit to District Engineer's Office. <br />FOR NCDOT USE ONLY: Please check the appropriate block <br />~_^ Rural F.oad ^ Subdivision platted prior to October 1, 1975 Subdivision platted after September 30, 1975 <br />R.Et~UIRE~iENTS l=al~ AE~DITioN .. <br />ifi this road meets the requirements necessary for addition, we agree to grant the Department <br />cfi Transportation aright-af-way of the necessary width to construct the road to the minimum <br />construction standards of the NCDOT. The right-of-way will extend the entire length of the <br />road that is requested to be added to the state maintained system and will nc{ude the <br />necessary areas outside of the right-or-way for cut and fill slopes and drainage. Also, we <br />agree fo dedicate additional right-of-way at intersections for sight distance and design <br />:purposes and execute said right-of-way agreerr-ent forms that wil! be submitted to us by <br />representatives of the NCDOT. The right-of-way shall be cleared at no expense to the <br />i~tCDOT, which includes the removal of utilities, fences, other obstructions, etc. <br />General Statute 136-102.6 (see page 29 for Statute} states that any subdivision recorded on or <br />after October 1, 1975, must be built in accordance with NCDOT standards in order #o be <br />eligible for addition to the State Road System. <br />I:C~Ai<~ a~,~FE FIC.}~ES <br />o.ts I`~it:l <br />LENG [ N @r~?,~D NAME ~fC?I~I=S LENGTH <br />Farm SR-S (31200f) <br />
The URL can be used to link to this page
Your browser does not support the video tag.