Browse
Search
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 10:57:49 AM
Creation date
5/5/2009 2:18:19 PM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4dd
Document Relationships
Agenda - 06-26-2007-4dd
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 06-26-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i) Such other reason as to the CM may appear prudent, proper, or equitable. <br />When grounds for withholding certification have been corrected or removed, the CM shall <br />make any payment due with respect to such certification as a part of its- next payment after <br />such certification. <br />20.6 No certificate of payment issued or progress payment made shall constitute an acceptance <br />of the Work or any part thereof. <br />20.7 The amount certified by the CM for payment shall be ninety percent (90%) of the value of <br />Work completed and materials stored since the CM's last certification as shown on the <br />Request for Payment, less any amounts not certified in accordance with paragraph 20.4, <br />and this amount shall be paid by the CM on or before the last business day of the month, <br />but payment shall not be past due if paid within fifteen (15) days thereafter. <br />20.8 If the Contractor's Work has progressed in accordance with the Master Schedule as of a <br />target date mutually agreed upon by the Owner, the Designer and the CM, and the <br />Contractor has provided to the CM the written consent of its sureties to the cessation of <br />further percentage retention, the amount certified for payment with respect to subsequent <br />Requests for Payment may, in the discretion of the CM, be one hundred percent (100%) of <br />the value of Work completed and materials stored since the CM's last certification as <br />shown on the Request for Payment, less any amounts not certified in accordance with <br />paragraph 20.4; provided, however, that the aggregate of periodic payments shall not <br />exceed ninety-five percent (95%) of the Contract Price. <br />ARTICLE 21. FINAL PAYMENT <br />21.1 Final Payment shall not be due to the Contractor until Final Completion <br />21.2 Upon Substantial Completion, the CM in conjunction with the Designer shall prepare and <br />submit to the Contractor deficiency lists identifying all portions of the Work which are shown <br />at that time to be incomplete or defective. Within thirty (30) days of receipt of any deficiency <br />list, the Contractor shall complete and correct all items on that list along with all other Work <br />required to achieve Final Completion of the Work. At any time prior to completion of the <br />period of warranty, the CM may submit to the Contractor supplemental deficiency lists, in <br />which case the Contractor shall complete or correct any and all new items identified on the <br />supplemental deficiency lists within the time period stipulated in paragraph 18.3 of these <br />General Conditions. <br />21.3 The making and acceptance of Final Payment shall constitute a waiver of all claims by the <br />CM except: <br />a) Claims arising from unsettled liens or claims against the Contractor. <br />b) Defective Work or materials appearing after Final Payment. <br />c) Failure of the Contractor to perform the Work in accordance with the Contract <br />Documents. <br />d) As conditioned in the Performance Bond. <br />e) Claims made prior to Final Payment which remain unsettled. <br />f) Amounts due arising under Articles 18 and 28 of these General Conditions. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 37 of 43 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.