Browse
Search
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 10:57:49 AM
Creation date
5/5/2009 2:18:19 PM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4dd
Document Relationships
Agenda - 06-26-2007-4dd
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 06-26-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall provide worksheets or tabulations describing the method by which the <br />direct net cost was calculated, and shall provide all data needed to support the calculation <br />of the direct net cost, all in a form acceptable to the CM. <br />ARTICLE 16. UNFORESEEN CONDITIONS <br />16.1 Should the Contractor encounter unforeseen conditions at the Project site materially <br />differing from those shown on the Drawings or indicated in the Specifications or differing <br />materially from those ordinarily encountered and generally recognized as inherent in work <br />of the character provided for in this Agreement, the Contractor shall immediately, and in no <br />event more than three (3) business days later, give notice to the CM of such conditions <br />before they are disturbed. The CM shall thereupon promptly notify the Designer and <br />Owner and investigate the conditions. The CM shall as soon as practicable request that <br />the Designer make such changes in the Drawings and/or Specifications as the CM and the <br />Contractor believe are necessary to continue the Work. Any increase or decrease in the <br />Contract Price resulting from such changes shall be adjusted in the manner provided <br />herein for adjustments as to extra and/or additional Work and changes. The CM shall not <br />be liable or responsible for additional work, costs, or changes to the Work that could have <br />been reasonably determined from any reports, surveys, and analyses made available for <br />the Contractor's review or that could have been discovered by the Contractor through the <br />performance of its obligations pursuant to the Contract Documents. <br />ARTICLE 17. CORRECTION OF WORK BEFORE FINAL PAYMENT <br />17.1 The Owner and the CM have the authority to stop or suspend Work and to order Work <br />removed or to order corrections of defective Work or Work not in compliance with the <br />Contract Documents where such action may be necessary to ensure successful completion <br />of the Work. <br />Any work, materials, fabricated items, or other parts of the Work which have been found by <br />the CM, the Owner or the Designer to be defective or not in accordance with the Contract <br />Documents shall be condemned and shall be removed from the Project by the Contractor, <br />and immediately replaced by new Work in accordance with the Contract Documents at no <br />additional cost to the CM. Work or property of the Owner or others damaged or destroyed <br />by virtue of such condemned Work shall be made good at the expense of the Contractor. <br />Correction of condemned Work described above shall be commenced by the Contractor <br />within twenty-four (24) hours after notice from the CM and shall be pursued to completion. <br />Should the Contractor fail to proceed reasonably with the above-mentioned corrections, the <br />CM may, three (3) days after the notice specified in the preceding sentence, proceed with <br />correction, paying the cost, including costs of uncovering such condemned Work, of such <br />corrections from amounts due or to become due to the Contractor. <br />Condemned Work removed shall be the property of the Contractor and shall be removed <br />from the Project by the Contractor within ten (10) days after notice to remove it, and if not <br />then removed, thereafter may be disposed of by the CM without compensation to the <br />Contractor and the cost of such disposal shall be deducted from amounts due or to become <br />due to the Contractor. <br />Should the cost of correction of the Work and, if applicable, disposal of the condemned <br />Work by the CM exceed the amount due or to become due the Contractor, the Contractor <br />and the Contractor's sureties shall be liable for and shall pay to the CM the amount of such <br />excess. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 33 of 43 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.