2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 10:57:49 AM
Creation date
5/5/2009 2:18:19 PM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4dd
Document Relationships
Agenda - 06-26-2007-4dd
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 06-26-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.29 The CM shall be responsible for the coordination of the Work of the separate contractors, <br />both as to space and time: The CM shall incorporate the Contractor's Construction <br />Schedule into the Master Schedule and coordinate the implementation of the Contractor's <br />Construction Schedule. The CM shall also coordinate close-out of the Project, including <br />but not limited to all testing, inspection, certifications, and approvals required by public <br />agencies. <br />The Contractor shall notify the CM promptly of any event or condition which could affect the <br />conduct or progress of the Work and shall cooperate fully with the CM and all other <br />separate contractors on the Project site. <br />7.30 The Owner has delegated to the CM all of its duties to coordinate and to expedite the Work <br />not expressly reserved to the Owner by other provisions of the Contract Documents. <br />7.31 All Work performed pursuant to the Contract Documents shall conform in all respects to the <br />North Carolina State Building Code and all other state, local, and national codes in effect at <br />the time of and applicable to this Work, including all requirements of the North Carolina <br />Department of Insurance. <br />7.32 The CM shall coordinate and supervise the installation of all sleeves, inserts, chases or <br />other components of the Work needed for mechanical, plumbing, electrical or other work by <br />the various contractors. The responsibility for exact location of such items shall be that of <br />the mechanical, plumbing, electrical or other prime contractor that requires the item for <br />passage or support of its work. Generally, the mechanical, plumbing, electrical or other <br />contractor that requires such items for support or passage of its work shall set its sleeves, <br />inserts, chases or other devices. If necessary to maintain the progress of and complete its <br />Work, however, the Contractor may be required to build or set sleeves, inserts, chases or <br />other components of the Work needed for mechanical, plumbing, electrical or other work by <br />other contractors. <br />7.33 The Contractor shall be responsible for permanently fixed service facilities and systems in <br />use during progress of the Work and shall strictly adhere to the following procedures: <br />a) Prior to acceptance of the Work by the Owner, the Contractor shall remove and <br />replace any part of the permanent building systems damaged through use during <br />construction. <br />b) Temporary filters shall be installed in each of the heating and air conditioning units, <br />return air grilles, and other locations to prevent intrusion of dust, dirt, and debris <br />during construction. Temporary filters shall be removed and replaced with new <br />filters immediately prior to Substantial Completion. <br />c) Extra effort shall be maintained to keep the building clean and under no <br />circumstances shall air systems be operated if finishing operations are creating <br />dust in excess of what would be considered normal if the building were occupied. <br />d) When the permanent lighting system is used during construction, lamps shall be <br />replaced and shall be new on the date of Substantial Completion. <br />ARTICLE 8. OWNER <br />8.1 The Owner shall issue communications and notices to the Contractor through the CM to the <br />extent contemplated by the Contract Documents. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 24 of 43 JUNE 2007 EDITION <br />