Browse
Search
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-008 Purchasing - Telesis Construction Management for County Campus Contracts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 10:57:49 AM
Creation date
5/5/2009 2:18:19 PM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4dd
Document Relationships
Agenda - 06-26-2007-4dd
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 06-26-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
no injury to previously completed Work, adjacent property, or existing facilities shall result <br />from its use. <br />When the methods and equipment to be used by the Contractor accomplishing the Work <br />are not prescribed in the Contract Documents, the Contractor shall be free to use any <br />methods or equipment that will accomplish the Work in conformity with the requirements of <br />the Contract Documents. <br />When. the Contract Documents specify the use of certain methods and equipment, such <br />methods and equipment shall be used unless others are authorized in writing by the CM. If <br />the Contractor desires to use a method or type of equipment other than that specified in the <br />Contract Documents, the Contractor may request authority from the CM to do so. The <br />request shall be in writing and shall include a full description of the methods and equipment <br />proposed and of the reasons for desiring to make the change. If approval is given, it shall <br />be on the condition that the Contractor shall be fully responsible for producing Work in <br />conformity with the requirements of the Contract Documents. If, after trial use of the <br />substituted methods or equipment, the CM or the Designer determines that the Work <br />produced does not meet the requirements of the Contract Documents, the Contractor shall <br />discontinue the use of the substitute method or equipment and shall complete the <br />remaining Work with the specified methods and equipment at no additional cost to the <br />Owner. The Contractor shall remove any deficient Work and replace it with Work of <br />specified quality, or take such other corrective action as the CM may direct. No change in <br />the Contract Price or in Contract Time shall be made as a result of authorizing a change in <br />methods or equipment under this paragraph. <br />7.6 All materials and equipment shall be new, except as otherwise provided in the Contract <br />Documents. When special makes or grades of material which are normally packaged by <br />the supplier or manufacturer are specified or approved, such materials shall be delivered to <br />the Project site in their original packages or containers with seals unbroken and labels <br />intact. <br />Materials shall be so stored as to assure the preservation of their quantity, quality and <br />fitness for the Work. Stored materials, even though approved before storage, may again be <br />inspected by the CM, the Designer or the Owner prior to their use in the Work and shall be <br />required to meet the requirements of the Contract Documents at the time they are <br />incorporated into the Work. Stored materials shall be located so as to facilitate their prompt <br />inspection. The Contractor shall coordinate the storage of all materials with the CM. <br />Materials to be stored at the Project or on the Owner's property shall not create an <br />obstruction to the Owner's or other contractor's reasonable activities. Private property shall <br />not be used for storage purposes without written approvals consistent with the provisions of <br />paragraph 20.3 of these General Conditions. The Contractor shall make all arrangements <br />and bear all expenses for the storage of materials on private property. Upon request, the <br />Contractor shall furnish the CM a copy of the property owner's permission. All storage sites <br />on private or the Owner's property shall be restored to their original condition by the <br />Contractor at its entire expense, except as otherwise agreed to (in writing) by the owner or <br />lessee of the property. <br />7.7 All materials and equipment shall be applied, installed, connected, erected, used, cleaned <br />and conditioned in accordance with the instructions of the applicable manufacturer, <br />fabricator, or processor, except as otherwise provided in the Contract Documents. <br />7.8 The Contractor will be fully responsible for all acts and omissions of its Subcontractors and <br />of persons directly or indirectly employed by them and of persons for whose acts any of <br />them may be liable to the same extent that the Contractor is responsible for the acts and <br />omissions of the Contractor's own employees. Nothing in the Contract Documents shall <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 19 of 43 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.