Browse
Search
2009-016 Purchasing - Telesis Construction Management, LLC - Amendment to Agreement dated 1-15-2008 for Construction Manager At Risk Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-016 Purchasing - Telesis Construction Management, LLC - Amendment to Agreement dated 1-15-2008 for Construction Manager At Risk Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:51:53 AM
Creation date
5/5/2009 12:53:44 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2009
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
6b
Document Relationships
2008-009 Purchasing - Telesis Construction Office Building Agreement of Purchase
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Agenda - 04-07-2009 -6b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 04-07-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y~ ~~~°° ~ <br />~6 <br />ORANGE COUNTY <br />NORTH CAROLINA <br />AMENDMENT <br />TO <br />AGREEMENT FOR CONSTRUCTION MANAGER AT RISK SERVICES <br />THIS AMENDMENT TO AGREEMENT FOR CONSTRUCTION MANAGER AT <br />RISK SERVICES (this "Amendment") is made effective this _~~ day of <br />,C 1~,~ ,2009, (the "Execution Date") by and between ORANGE <br />COUNTY, NORTH CAROLINA, a body corporate and politic and a political subdivision of <br />the State of North Carolina ("Owner"), and TELESIS CONSTRUCTION MANAGEMENT, <br />LLC, a North Carolina limited liability company ("CMAR") (Owner. and CMAR to sometimes <br />be referred to together herein as the "Parties") <br />WITNESSETH: <br />WHEREAS, Owner and CMAR entered into an Agreement for Construction Manager at <br />Risk Services made effective January 15, 2008 (the "Agreement") which agreement provides for <br />the total construction of a two story Public Library and three story Office Building to be located on <br />Margaret Lane in Hillsborough, North Carolina; and <br />WHEREAS, Section 11.9 of the Agreement requires a performance bond and a payment <br />bond in an amount equal to 100% of the Guaranteed Maximum Price; and <br />WHEREAS, the Guaranteed Maximum Price contains elements not part of the construction <br />contract amounts which amounts are required to be bonded in accordance with N.C. Gen. Stat. § <br />143-128.1; and <br />WHEREAS, the Parties now desire to amend the agreement to conform the bonding <br />requirements to N.C. Gen. Stat. § 143-128.1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.