Orange County NC Website
Exhibit C: Design Cost Credit due to County: Orange County Library pars 2.U3 <br />sneering Contract Amounts <br />Brockweil ~ Associates Architecture Library <br />Development Plan 4,200 <br />Architecture 91,471 <br />Structural Engineer _ ~ _ 17,500 <br />EDi Engineering <br />Plumbing, Mechanical and Electrical Engineering 35,400 <br />Construction Administration Fee Adjustment 5,772 <br />Total of Contract Amounts <br />Less Contract Fees Paid by Telesis-0riginal' (27,460) <br />- Construction Admin2 (2,886) <br />Credit Sum due Orange County 123,997 <br />1 -The basic services fees for design of the Office Building. and Library were <br />included in the original Purchase and Saie Agreement with Telesis Construction <br />Management Since these fees are now the County's responsibility, the fees are <br />being credited in th~ Agreement to the County. The original fees of $397,806 were <br />approved by the BOCC on 12/11/07. This net figure represents the true credit since <br />Telesis had previously paid $74,215 of this $397,806. The number footnoted is the <br />library share of the amount paid by Telesis. <br />2 -The professional design fees that were originally represented in the Purchase and <br />Sale Agreement did not include design and engineering construction administration <br />fees. This amount represents. a credit to the County for fifty percent of the total of <br />$15,600 of additional fees. Telesis Construction Management has agreed to pay the <br />other half. The number footnoted is the library share of the amount paid by Telesis. <br />