Browse
Search
2009-017 Purchasing - Telesis Construction Management, LLC - Amendment to Agreement of Purchase and Sale (Library Building) dated 2-1-2008
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-017 Purchasing - Telesis Construction Management, LLC - Amendment to Agreement of Purchase and Sale (Library Building) dated 2-1-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 12:13:10 PM
Creation date
5/5/2009 12:06:11 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2009
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
6b
Document Relationships
2008-009 Purchasing - Telesis Construction Office Building Agreement of Purchase
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Agenda - 04-07-2009 -6b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 04-07-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B: Purchase and Sale Amendment Reconciliation: Library para 2.01 <br />Library <br />Original Contract Purchase Price 6,662,957 <br />Sustainable 4 Pipe HVAC System' 164,861 <br />Generator, Structural Steel, and Site Revisions2 253,942 <br />Contract Upfit Allowance Adjustment' (588,193) <br />Amended Purchase Price 6,493,567 <br />Footnotes <br />1 -This represents the sustainable designs approved by the BOCC on 11/6/08 <br />2 -These costs are approved alternates and changes to those alternates that arrived after bid. The changes <br />are the result of 1)post-design structural steel reinforcement for roof mounting of the generators instead of <br />generator placement in the alleyway between the two buildings, a change needed to accommodate service <br />vehicles in the alleyway; 2) the availability of more efficient HVAC controls for more efficient and sustainable <br />operation of the library; and 3) mathematical reconciliation between the conventional design and the sustainable <br />design costs. These additional costs are reasonable for the work to be performed. <br />3 -Adjustments made due to the actual bid cost of the building upfits related to the contractual allowances <br />described in paragraph 2.02 of the original Purchase and Sale Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.