Orange County NC Website
Exhibit B: Purchase and Sale Amendment Reconciliation: Office. Bldg para 2.01 <br />Original Contract Purchase Price <br />Sustainable 4 Pipe HVAC System' <br />Office Bldg <br />11,276,122 <br />280,708 <br />Generator, Structural Steel, and Site Revisions2 432,388 <br />Contract Upfit Allowance Adjustment3 <br />119,851 <br />Amended Purchase Price 12,109,069 <br />Footnotes <br />1 -This represents the sustainable designs approved by the BOCC on 11/6/08 <br />2 -These costs are approved alternates and changes to those alternates that arrived after bid. The changes <br />are the result of 1)post-design structural steel reinforcement for roof mounting of the generators instead of <br />generator placement in the alleyway between the two buildings, a change needed to accommodate service <br />vehicles in the alleyway; 2) the availability of more efficient HVAC controls for more efficient and sustainable <br />operation of the office building; and 3) mathematical reconciliation between the conventional design and the <br />sustainable design costs. These additional costs are reasonable for the work to be performed. <br />3 -Adjustments made due to the actual bid cost of the building upfits related to the contractual allowances <br />described in paragraph 2.02 of the original Purchase and Sale Agreement. <br />