Orange County NC Website
Sec 6 32 8 Effect upon outstanding floodplain development permits. <br />Nothing herein contained shall require any change in the plans construction, size, or <br />designated use of an~ development or anypart thereof for which a floodplain development <br />permit has been Granted by the Floodplain Administrator or his/her authorized agents <br />before the time of passage of this Ordinance provided however that when construction is <br />not begun under such outstandi~,,permit within a period of six (6) months subsequent to <br />passage of this Ordinance or any revision thereto construction or use shall be in <br />conformity with the provisions of this Ordinance. <br />Sec. 6.32.9 Enforcement <br />The provisions of the SFHA Overlay District shall be enforced in accordance with the <br />requirements contained within Section 23.5 of this Ordinance. <br />PART VIII. That Article 8 Special Uses be amended by creating a new Section 8.6.1 entitled <br />Additional standards for development of uses within Special Flood Hazard Area Overlay <br />District (SFHA) to read as follows: <br />Section 8 61 Additional Standards for Development of Uses within Special Flood <br />Hazard Areas. <br />The Board of County Commissioners may issue a Class "A" Special Use Permit for solid <br />waste disposal facilities hazardous waste management facilities salvage/funk yards, and <br />chemical store facilities that are located in SFHAs if all of the following conditions are <br />met: <br />a. The use serves a critical need in the Orange County. <br />b. No feasible location exists for the use outside the SFHA. <br />c. The reference level of any structure is elevated or flood proofed to at least the <br />re u~ latory flood protection level. <br />d. The use complies with all other applicable federal, state and local laws. <br />e. Orange County has notified the Secretary of the North Carolina Department of <br />Crime Control and Public Safety of its intention to grant a Special Use Permit at <br />least thirty (30) days before granting the permit. <br />The Board is required to make affirmative findings of fact based on the testimony of the <br />applicant(s) as to the project's compliance with these standards. <br />PART IX. That Article 10 Parking be amended by creating a new 10.2 to read as follows: <br />Sec. 10.2 Prohibited within Special Flood Hazard Areas. <br />Any off-street parking and loading facilities are prohibited within a Special Flood Hazard <br />Area. <br />