Browse
Search
RES-2009-027a Flood Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-027a Flood Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 2:17:50 PM
Creation date
5/4/2009 11:06:16 AM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
5b
Document Relationships
Agenda - 04-21-2009 - 5b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 04-21-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d Where a fire wall or independent perimeter load-bearing wall is provided <br />between the addition and the existing building, the addition(s) shall be <br />considered a separate building and only the addition need comply with the <br />standards for new construction. <br />Sec. 6.32.3 Specific Standards for floodplains without established base flow <br />elevations (Approximate Zone A). <br />Within the SFHAs established in Section 4.2.38 are where no base flood data has been <br />provided the following_provisions shall apply: <br />1. No encroachments including fill new construction, substantial improvements or new <br />development shall be permitted within a distance of fifty~50) feet each side from top <br />of bank or five times the width of the stream whichever is greater, unless certification <br />with supporting technical data by a North Carolina licensed Professional Engineer is <br />provided demonstrating that such encroachments shall not result in any increase in <br />flood levels during the occurrence of the base flood discharge. <br />2. If Section 6.32.2(1) is satisfied and BFE data is available from other sources, all new <br />construction and substantial improvements within such areas shall also comply with <br />all applicable provisions of this Ordinance and shall be elevated or flood proofed <br />according to elevations established according to Section 4.2.38. <br />3. All subdivisions manufactured home arks and other development proposals located <br />within SFHAs shall provide BFE data. Such BFE data shall be adopted by reference <br />per Section 4.2.39 to be utilized in implementing this Ordinance. <br />When BFE data are not available from a Federal, State, or other source, the reference <br />level including basement shall be elevated at least two (2) feet above the highest <br />adjacent grade. <br />Sec. 6.32.4 Subdivisions, manufactured home narks, and major developments. <br />All subdivisions manufactured home park, and major development proposals located <br />within SFHAs shall: <br />1. Be consistent with the need to minimize flood damage. <br />2. Have public utilities and facilities such as sewer gas electric, cable, and water <br />systems located and constructed to minimize flood damage. <br />3. Have adequate drainage provided to reduce exposure to flood hazards <br />4. Have BFE data provided if development exceeds either of fifty (50) lots/units or five <br />~5) acres. Such BFE data shall be adopted by reference per Section 4.2.39. <br />Sec. 6.32.5 Standards for floodplains with BFE but without established floodways <br />or non-encroachment areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.