Browse
Search
Agenda - 05-05-2009 - Information Item
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 05-05-2009
>
Agenda - 05-05-2009 - Information Item
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2009 2:20:07 PM
Creation date
5/1/2009 2:20:03 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item
Document Relationships
Minutes - 20090505
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br />Table 24: Summary of Conformity Status of Triangle Transportation Plans <br />Criteria ( indicates the <br />criterion is met) Burlington- <br />Graham MPO <br />2035 LRTP & <br />2009-15 TlP* Durham-Chapel <br />Hill-Carrboro MPO <br />2035 LRTP & <br />2009-15 TIP* Capital Area <br />MPO <br />2035 LRTP & <br />2009-15 TlP* Rural (Donut) <br />Area of the <br />Triangle <br />2009-15 STIP <br />Less Than Emissions Budgets ~ .~ ~ ~ <br />TCM Implementation The NC SIP includes no Transportation Control Measures in the Triangle Area <br />Interagency Consultation ~ ~ ~ ~ <br />Latest Emissions Model .~ .~ ~ ~ <br />Latest Planning Assumptions ~ .~ ~ ~ <br />Fiscal Constraint .~ .~ <br />* The 2009-15 TIPS are direct subsets of the amended 2030 LRTPs <br />Specific conformity findings for each of these azeas aze listed below: <br />Burlington-Graham MPO Ozone Conformity Finding for the 2035 Long-Range <br />Transportation Plan and 2009-2015 Transportation Improvement Program <br />Based on the analysis and consultation and involvement processes described in this report, the <br />Burlington-Graham MPO 2035 Long-Range Transportation Plan and 2009-2015 Transportation <br />Improvement Program are found to conform to the purpose of the North Cazolina State <br />Implementation Plan. The emissions expected from the implementation of the Burlington- <br />Graham MP0 2035 Long-Range Transportation Plan and 2009-2015 Transportation <br />Improvement Program aze in conformity with the 8-hour ozone standazd. <br />Capital Area MPO Ozone and Carbon Monoxide Conformity Finding for the 2035 Long- <br />Range Transportation Plan and 2009-2015 Transportation Improvement Program <br />Based on the analysis and consultation and involvement processes described in this report, the <br />Capital Area MPO 2035 Long-Range Transportation Plan and 2009-2015 Transportation <br />Improvement Program aze found to conform to the purpose of the North Cazolina State <br />Implementation Plan. The emissions expected from the implementation of the Capital Area MPO <br />2035 Long-Range Transportation Plan and 2009-2015 Transportation Improvement Program are <br />less than the applicable budgets for NOx and CO; therefore the LRTP and TIP aze in conformity <br />with the 8-hour ozone standazd and the carbon monoxide standazd. <br />Durham-Chapel Hill-Carrboro MPO Ozone and Carbon Monoxide Conformity Finding for <br />the 2035 Long-Range Transportation Plan and 2009-2015 Transportation Improvement <br />Program <br />Based on the analysis and consultation and involvement processes described in this report, the <br />Durham-Chapel Hill-Carrboro MPO amended 2035 Long-Range Transportation Plan and 2009- <br />2015 Transportation Improvement Program are found to conform to the purpose of the North <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.