Browse
Search
Agenda - 05-05-2009 - Information Item
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 05-05-2009
>
Agenda - 05-05-2009 - Information Item
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2009 2:20:07 PM
Creation date
5/1/2009 2:20:03 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item
Document Relationships
Minutes - 20090505
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br />Table 23. Chatham County (part) Emissions Comparison Summary (kg/day) <br /> NOS <br />Year SIl' Budgets Long Range Plan or TIP Emissions <br />20152 1,565 895 <br />20172 948 814 <br />20253 948 491 <br />2035' 948 445 <br />5. To obtain kilograms per day, multiply tons per day by 907.18; SIP CO budgets are listed in tons/day <br />6. Budget year <br />7. LRTP interim year <br />8. LRTP Horizon yeaz. <br />5. Public Involvement and Interagency Consultation <br />The 2035 Transportation Plans are consistent with consultation requirements discussed in 40 CFR <br />93.105. Interagency consultation was a cooperative effort on the part of the Capital Area MPO, <br />the Durham-Chapel Hill-Carrboro MPO, the Burlington-Graham MPO, the Triangle Area RPO, <br />the Kerr-Tar RPO, the Upper Coastal Plain RPO, the North Carolina Department of <br />Transportation and the Federal Highway Administration. The process was administered by the <br />Triangle J Council of Governments on behalf of the partners and was organized according to the <br />sections in the document titled Triangle Region Transportation Conformity: Pre-Analysis <br />Consensus Plan, a document agreed to at the initial interagency consultation meeting on June 9, <br />2008 and updated periodically. Subsequent interagency consultation meetings were July 11, <br />2008, July 25, 2008, October 3, 2008, October 30, 2008, December 12, 2008, January 9, 2009, <br />February 13, 2009 and March 6, 2009. <br />A copy of the latest version of the Consensus Plan, together with summaries of the interagency <br />consultation meetings are included in Appendix C. <br />Public review of this report is being handled in accordance with each MPO's public participation <br />policy. A copy of the public participation policies are included in Appendix J. Comments from <br />the public participation process will be incorporated into the final Conformity Analysis and <br />Determination Report. Those comments will be included in Appendix K of the final report. , <br />6. Conclusion <br />Based on the analysis and consultation discussed above the following transportation plans and <br />TIPS conform to the purpose of the North Cazolina State Implementation Plan. In every horizon <br />yeaz for every pollutant in each geographic area, the emissions expected from the implementation <br />of the long-range plans and TIPS are less than the emissions budgets established in the SIP. <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.