Browse
Search
Agenda - 05-05-2009 - Information Item
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 05-05-2009
>
Agenda - 05-05-2009 - Information Item
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2009 2:20:07 PM
Creation date
5/1/2009 2:20:03 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item
Document Relationships
Minutes - 20090505
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />Table 10. Cross-Reference Index <br />Conformity Determination Report for the Long-Range Transportation Plans and TIPS in the Triangle Region <br />Ozone Maintenance Area <br />Conformity Requirement Page # or Appendix <br />Formal findings of conformity. pp. 29-30 <br />Table of Contents. m <br />The purpose of this report is to comply with the requirements of the CAAA, <br />SAFETEA-LU, and 40 CFR 51 and 93. p• g <br />The former and current classification of the airshed and the pollutants for which the <br />airshed was previously classified asnon-attainment. p. 12 <br />The dates Durham and Wake Counties were redesignated to a Maintenance Area <br />under the CO standazd and the date the region was designated to maintenance under <br />the 8-hour ozone standazd. <br />p. 12 <br />The emissions expected from implementation of the long-range plans are equal to, or <br />less than, the emissions budgets in the Maintenance Plans and established in the SIP. pp 26-28 <br />The adopted long-range plan is fiscally constrained (§93.108). p. 14 <br />The latest planning assumptions were used in the conformity analysis (§93.110). pp. 14-15 <br />The latest emissions model was used in the conformity analysis (§93.111). p. 22 <br />The list of federally funded T.C.M. activities included. (§93.113). p. 23 <br />Conformity determined according to §93.105 and the adopted public involvement <br />procedures. p. 28 <br />Dates of the Transportation Advisory Committee reviews of the conformity <br />determination and the recommendation. Appendix M <br />SIP emissions budget comparison demonstrates conformity of the adopted long-range <br />transportation plan and TIP. p. 29-30 <br />Listing of 2035 LRTP and 2009-15 TIP projects in each analysis year (both highway <br />and transit). pp• 15-17, Appendix <br />D <br />Estimation of Vehicle Starts. ~ p. 23, Appendix G <br />Analysis of "rural (donut) area" projects. Appendix I <br />Off-model analysis performed. p. 23, Appendix H <br />Significant comments of reviewing agencies addressed by the MPO, or a statement <br />that no significant comments were received. Appendix K <br />Emissions Calculations. Appendix I <br />MOBILE6.2 input files. Appendix F <br />
The URL can be used to link to this page
Your browser does not support the video tag.