Browse
Search
Agenda - 05-05-2009 - 4m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 05-05-2009
>
Agenda - 05-05-2009 - 4m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 11:13:52 AM
Creation date
5/1/2009 1:15:23 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4m
Document Relationships
Minutes - 20090505
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section I <br />2003: Increase of 619 at Rashkis Elementary <br />2004: No changes at Elementary, Middle, or <br />High School levels. <br />2005: No changes at Elementary, Middle, or <br />High School levels. <br />2006: No changes at Elementary, Middle, or <br />High School levels. <br />2007: An increase of 800 at the High School <br />level with the opening of Carrboro High <br />School. <br />2008: An increase of 323 at the Elementary <br />School level due to the opening of Morris <br />Grove Elementary School and the <br />implementation of the 1:21 class size ratio in <br />grades K -3 <br />2003: No net increase in capacity at <br />Elementary level. No changes at Middle <br />School level. Increase of 1,000 at Cedar Ridge <br />High School. <br />2004: No net increase in capacity at <br />Elementary level. No changes at Middle or <br />High School levels. <br />2005: An increase in capacity of 100 at <br />Hillsborough Elementary with the completion <br />of renovations. <br />2006: An increase in capacity of 700 at the <br />Middle School level with the completion of <br />Gravelly Hill Middle School and an increase of <br />15 at the High School level with the temporary <br />location of Partnership Academy Alternative <br />School. An increase of 2 at the Elementary <br />level due to a change in the capacity <br />calculation for each grade at each school. <br />2007: No changes at Elementary, Middle, or <br />High School levels. <br />2008: A decrease of 228 at the Elementary <br />School level due to the implementation of the <br />1:21 class size ratio in grades K -3 and an <br />increase of 25 at the High School level with the <br />completion of the new Partnership Academy <br />Alternative School. <br />4. Analysis of Existing Conditions Analysis of Existing Conditions <br />Chapel Hill Carrboro School District Orange County School District <br />The Schools Facilities Task Force developed The Schools Facilities Task Force developed a <br />a system to calculate capacity. Any changes system to calculate capacity. Any changes <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.