Orange County NC Website
net reduction of vne state teaching position and one supervisor's position. The <br />school unit has completed facilities for both a graphics and horticultural position <br />during the past year and strongly fee15 these stations must be filled. The budget <br />they have proposed to the County will barely enable them to handle these critical <br />situations. <br />Additionally the system feels it can save substantially in its capital_improve- <br />ment program if it is able tv hire a full time year round paint crew. <br />Tn the area of supportive services for students, the system need additional funds - <br />to improve services for exceptional students. <br />In the area of Capital Outlay, the School Board feels its number one priority is <br />construction of its cultural arts center. Almost all Capital Outlay, above $336,000.00 __ <br />needed for normal maintenance, they receive will be devoted to this project. At pre- <br />sent this project is in an advanced stage of design and they hope to have the project <br />out to bid in November. If the unit cannot get an arrangement that will enable them <br />to sign actual contracts in November work on this project will have to be stopped for <br />about a year. In that time interval they feel construction cost will increase signi- <br />ficantly above the level they stand today. <br />Board member, Sam Holton, spoke saying there is no fat in the budget they have <br />proposed. <br />Commissioner Gustaveson spoke saying in his opinion there is no way the County <br />can finance its capital needs over the next five years within the framework of its <br />present revenue structure. <br />Dr. Hanes and Mrs. Scroggs stated the School Board was now beginning to realize <br />that their proposed five year capital plan must be drawn out over a longer period of <br />time and that they were now thinking about this plan in a six year context. <br />Mrs. Scroggs stated the School Board had considered requesting an increase in <br />the supplementary tax as a device to help alleviate pressures on their Capital Out- <br />lay Budget but felt on balance this was a poor solution to this problem as it would <br />probably create more problems than it would solve. <br />In summary Chairman Garrett stated all Board members recognized the needs of the <br />school system, were in sympathy with its efforts and would do their best in funding <br />the school budget. <br />The Chairman of the Orange'Person-Chatham Mental Health Agency introduced Dr. <br />Rolffs Pinkerton tp review the budget of the Mental Health Agency. Dr. Pinkerton <br />and Mrs. Walton reviewed the budget proposal program by answering questions as they <br />were presented from the floor. In summary their budget was one of continuation of <br />existing programs at their present level of operations. <br />S. M. Gattis, Acting Clerk <br />Flora Garrett, Chairman <br />MINUTES <br />ORANGE COUNTX BOARD OF COMMISSIO'aERS <br />June 5, 1975 <br />The Board of Commissioners of Orange County met in special session on Thursday, <br />.Tune 5, 1975, in the Commissioners Room of the Courthouse in Hillsborough to continue <br />discussion of the proposed 1975-1976 County Budget. <br />Members present were Flora Garrett, Norman Gustaveson, San Pinney, Norman Walker, <br />and Richard Whitted. <br />Members absent: None. <br />Chairman Garrett opened the meeting by calling upon Mr. Roland Scott, Chairman <br />of the Orange County Board of Education, to present the proposed 1975-1976 budget of <br />the County Board of Education. Mr. Scott advised Chairman Garrett that Mr. George <br />williams, Superintendent, would present the requested budget. <br />Mr. Williams opened his presentation by saying the Board of Education would <br />have to receive a Cufrent Expense appropriation of $1,079,916 to continue next year <br />the program they presently have in operation. This large increase is brought about <br />because of several factors; inflation, loss of teaching positions funded by the State <br />and the. gradual elimination of some unexpended appropriations the Board of Education <br />had accumulated over the past several years. <br />To compound their financial plight further they feel their ESAA appropriation <br />(5114,800) for a reading program is in serious danger of not being refunded. Also <br />the opening of the new Grady Hrown School and restructuring the grade pattern within <br />the system requires the addition of at least seven additional professional positions <br />($83,320.). <br />