Orange County NC Website
ExI~IBIT F <br />Memorandum <br />To. Laura Blackmon, County Manager <br />From: Gayle Wilson, Solid waste Management director <br />Subject: Change in Landlll Operations Effective Immediately <br />By Order of NC Division of waste Management, Strict Regulation <br />of Incoming Materials to Construction & Demolition <br />~C&D} Landfill To be Enforced <br />Impacts: Estimated Shift of S,ooO Tons from C&Il Landfill to MSw Landfill; <br />Potential Reduction of Available 1VIS~w landfill Capacity by Five <br />Months; and Additional Disposal Costs for Customers <br />Date: April 18, 2408 <br />The ~C Division of waste Management ~DwM} recently notified the Solid waste <br />Nana ement De artment that strict regulatory adherence will be applied for incoming <br />g p .. <br />n~ater~als to the Construction and Demol~t~on ~C&D~ landfill beg~n~ung ~mmedlately. <br />According to state rules regulating C&D landfills, only C&D waste "generated solely <br />from the construction, remodeling, repair, or demolition operations on pavement and <br />buildings or structures" is authorized to be placed i.n a permitted CAD landfill. ~ "C&D <br />waste does not include municipal and industrial waste that may be generated by the on- <br />oin o erations ofbuildings or structures". This distinction thereby prohibits, for <br />g g p <br />exan~.ple: I }apiece of broken pipe scrap collected from the backyard during a home <br />cleanup from being placed in C&D; 2} material generated at a cabinet shop operation, <br />even if it is plywood with laminate or other similar material, from burial in the C&D <br />landfill; 3} a piece of damaged hose generated from a home use is not allowed whereas <br />the same scrap piece of~hose from: a construction site would be allowed, and 4} a small <br />sawed end of a "2 by 4" from Horne Depot's shop is prohibited, but the same piece of <br />wood f rom a construction site is allowed. <br />During a March visit by our region's Dw~ Xnspector, it was observed that as much as <br />half of the material currently being placed into the County's C&D landfill did not fall <br />under their def ninon of C&D above. It often originated from. cleanups and other non <br />construction activity. Due to this distinction, and under the threat of issuance of a notice <br />of violation of the County's landfill operating permit, our region's state inspector has <br />mandated that grange County change our operations immediately to comply. <br />Accordingly, the staff esti.rnates slightly more than 50% of current C&D wastes will need <br />to be diverted to the lined MSw landfill. This equates to an additional B,DOO tons ~of <br />material a year that now will need to be placed into the MSw landfill. t will impact the <br />County in loss of an estimated five months of available N~Sw landfll space and a cost <br />increase of i5% cost to our customers x$47 per ton in NiSw compared to $4i in C&D}. <br />